Skip to content
Gridcensus

Greenfield (BAXTER WILSON - STERLINGTON)

Greenfield

Madison Parish, Mississippi · MISO

DC Readiness
55.1
Good / 100

At a glance

Greenfield (BAXTER WILSON - STERLINGTON) is a greenfield datacenter candidate site in Madison Parish, Mississippi, scoring 55.1/100 DC Readiness — 1st of 4 scored sites in the county. Its nearest substation is BAXTER WILSON. It sits in the MISO grid region, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 1,000 MW of candidate capacity here.

Power & interconnection

Nearest substationBAXTER WILSON
Substation voltage500 kV
Available capacity1,000 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth59
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPVenyu BTR1
IXP distance137.5 mi
Fiber providers3
Fiber coverage21.6%

Site characteristics

Site typeGreenfield
Land contactMadison Parish County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score42/100

Location context

Nearest datacenterAmazon Web Services
DC distance67.0 mi
County hazard (FEMA NRI)Very High (58)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.97¢/kWh
Industrial electricity10.88¢/kWh
Cooling degree days2,700
Heating degree days1,700
Land price / acre$3,764

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 3 nearby

Get alerts

Track Greenfield (BAXTER WILSON - STERLINGTON)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Greenfield (BAXTER WILSON - STERLINGTON) compare with other sites in Madison Parish?

Greenfield (BAXTER WILSON - STERLINGTON) ranks 1st of 4 scored candidate sites in Madison Parish. Its 55.1/100 is roughly in line with the county average of 52.0. It is roughly in line with the Mississippi average of 53.0 and roughly in line with the national average of 53.2.

Against the Mississippi average, its strongest sub-score is power availability (72 vs 37) and its weakest is fiber connectivity (54 vs 69). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Greenfield (BAXTER WILSON - STERLINGTON) to power, fiber and other datacenters?

The nearest mapped substation, BAXTER WILSON, is the closest grid connection point on record and operates at 500 kV. For connectivity, the nearest internet exchange facility is Venyu BTR1 at 137.5 miles. 3 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Amazon Web Services, 67 miles away.

What are the flood, water and hazard risks at Greenfield (BAXTER WILSON - STERLINGTON)?

At the county level, FEMA's National Risk Index rates Madison Parish "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power20%
50
Fiber connectivity12%
54
Energy cost10%
50
Water risk7%
88
Natural hazard6%
42
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Madison Parish, ranked by DC Readiness.

Sites near Greenfield (BAXTER WILSON - STERLINGTON)
SiteTypeVoltageCapacityQueue waitScore
EC FFE Madison ParishGreenfield——4.3 yrs53.5
UNKNOWN116939Substation-Adjacent115 kV100 MW4.3 yrs53.4
Greenfield (UNKNOWN116938 - UNKNOWN116939)Greenfield115 kV100 MW4.3 yrs45.9

Greenfield (BAXTER WILSON - STERLINGTON): common questions

What is the DC Readiness score of Greenfield (BAXTER WILSON - STERLINGTON)?

Greenfield (BAXTER WILSON - STERLINGTON) scores 55.1/100 on the GridCensus DC Readiness scale, rated good. It ranks 1st of 4 scored sites in Madison Parish. The Madison Parish average is 52.0 and the Mississippi average is 53.0.

What is the nearest substation to Greenfield (BAXTER WILSON - STERLINGTON)?

The nearest mapped substation is BAXTER WILSON, at 500 kV. GridCensus catalogs 1,000 MW of candidate capacity for the site.

What grid region is Greenfield (BAXTER WILSON - STERLINGTON) in?

Greenfield (BAXTER WILSON - STERLINGTON) is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Greenfield (BAXTER WILSON - STERLINGTON) from an internet exchange?

The nearest internet exchange facility is Venyu BTR1, about 137.5 miles away; 3 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Greenfield (BAXTER WILSON - STERLINGTON), Madison Parish, MS”, https://gridcensus.com/datacenter-sites/mississippi/madison-parish/greenfield-baxter-wilson-sterlington-8f45a8de (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (BAXTER WILSON - STERLINGTON), Madison Parish is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.