EC Near Sweatt

Greenfield

Lauderdale, Mississippi · MISO

DC Readiness
54.7
Fair / 100

EC Near Sweatt is a greenfield datacenter candidate site in Lauderdale, Mississippi, interconnecting through MISO. It screens at 54.7/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_MS
Wholesale LMP$31.68/MWh
Utility commercial rate0.11¢/kWh
UtilityMISSISSIPPI POWER COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth59
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance77.1 mi
Fiber providers5
Fiber coverage63.7%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance465.3 mi

Site characteristics

Site typeGreenfield
Land contactLauderdale County Assessor
Parcel APN066130000000000500
Land owner typeprivate
Buildability50.0/100
Land cover (NLCD)Mixed Forest
Former usenear retired gas plant (10km)

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score55/100
Construction cost index80.5 (avg 100)

Location context

Nearest datacenterAmazon Canton Data Center
DC distance76.0 mi
Nearest rail1.3 mi
Nearest gas pipeline2.5 mi
Nearest fiber route57.4 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.32¢/kWh
Industrial electricity5.82¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,750

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Sweatt

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
42
Fiber connectivity12%
66
Energy cost10%
85
Water risk7%
91
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
83
Gas pipeline2%
92
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Lauderdale, ranked by DC Readiness.

Sites near EC Near Sweatt
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109540Substation-Adjacent230 kV300 MW2.8 yrs59.1
UNKNOWN110565Substation-Adjacent115 kV100 MW1.0 yrs58.8
UNKNOWN109640Substation-Adjacent230 kV300 MW2.8 yrs57.5
UNKNOWN157848Substation-Adjacent230 kV300 MW2.8 yrs57.3
UNKNOWN156972Substation-Adjacent230 kV300 MW2.8 yrs57.3
UNKNOWN156971Substation-Adjacent230 kV300 MW2.8 yrs57.3
EC Near SweattGreenfield——1.4 yrs57.0
EC Near SweattGreenfield——1.4 yrs56.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near Sweatt, Lauderdale is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.