UNKNOWN110565

Substation-Adjacent

Lauderdale, Alabama · SERC

DC Readiness
59.1
Good / 100

UNKNOWN110565 is a substation-adjacent datacenter candidate site in Lauderdale, Alabama, interconnecting through SERC. It screens at 59.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN110565
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityALABAMA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPC Spire Mississippi
IXP distance77.0 mi
Fiber providers5
Fiber coverage63.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterC Spire Mississippi
DC distance77.0 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.32¢/kWh
Industrial electricity5.82¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,750

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; PSC review for very large loads.

DC tax incentiveYes
Large-load threshold≥ 150 MW

Alabama PSC review threshold for large loads.

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN110565

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
72
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Lauderdale, ranked by DC Readiness.

Sites near UNKNOWN110565
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109540Substation-Adjacent230 kV300 MW2.8 yrs60.1
UNKNOWN109640Substation-Adjacent230 kV300 MW2.8 yrs59.3
UNKNOWN157848Substation-Adjacent230 kV300 MW2.8 yrs59.1
UNKNOWN156971Substation-Adjacent230 kV300 MW2.8 yrs59.1
UNKNOWN156972Substation-Adjacent230 kV300 MW2.8 yrs59.1
EC Near SweattGreenfield——1.4 yrs58.8
EC Coal Lauderdale CountyGreenfield——1.4 yrs58.0
EC Near SweattGreenfield——1.4 yrs58.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN110565, Lauderdale. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.