Jackson Regional Office

Federal Excess

Hinds, Mississippi · PJM

DC Readiness
50.9
Fair / 100

Jackson Regional Office is a federal excess datacenter candidate site in Hinds, Mississippi, interconnecting through PJM. It screens at 50.9/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityENTERGY MISSISSIPPI LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPC Spire Mississippi
IXP distance112.2 mi
Fiber providers5
Fiber coverage54.7%

Site characteristics

Acreage12 ac
Buildable load (est.)~5–12 MWland-based
Former useOffice Building Locations

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterAmazon Web Services
DC distance6.0 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.56¢/kWh
Industrial electricity7.85¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,474

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Jackson Regional Office

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
38
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Hinds, ranked by DC Readiness.

Sites near Jackson Regional Office
SiteTypeVoltageCapacityQueue waitScore
LAKEOVERSubstation-Adjacent500 kV1,000 MW2.8 yrs64.8
RAY BRASWELLSubstation-Adjacent500 kV1,000 MW2.8 yrs63.9
REX BROWN 230KVSubstation-Adjacent230 kV300 MW2.8 yrs62.8
KINGSWOODSubstation-Adjacent230 kV300 MW2.8 yrs59.7
UNKNOWN110121Substation-Adjacent230 kV300 MW2.8 yrs59.7
UNKNOWN110157Substation-Adjacent230 kV300 MW2.8 yrs59.6
TAP145961Substation-Adjacent230 kV300 MW2.8 yrs59.6
NORTHSIDE DRIVESubstation-Adjacent230 kV300 MW2.8 yrs59.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Jackson Regional Office, Hinds is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.