Skip to content
Gridcensus

EC Near Rex Brown

Greenfield

Hinds, Mississippi · MISO

DC Readiness
57.7
Good / 100

EC Near Rex Brown is a greenfield datacenter candidate site in Hinds, Mississippi, interconnecting through MISO. It screens at 57.7/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_MS
Wholesale LMP$31.68/MWh
Utility commercial rate0.13¢/kWh
UtilityENTERGY MISSISSIPPI LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth59
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance117.4 mi
Fiber providers5
Fiber coverage54.7%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance378.2 mi

Site characteristics

Site typeGreenfield
Land contactHinds County Assessor
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest
Former usenear retired gas plant (10km)

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteERNIE S CAR CARE CENTER
Hazard sub-score45/100
Construction cost index80.5 (avg 100)

Location context

Nearest datacenterAmazon Web Services
DC distance8.3 mi
Nearest rail1.2 mi
Nearest gas pipeline0.9 mi
Nearest fiber route75.8 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.56¢/kWh
Industrial electricity7.85¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,474

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Rex Brown

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
65
Energy cost10%
85
Water risk7%
90
Natural hazard6%
45
Buildability7%
45
Labor market4%
50
DC cluster4%
80
Land / acreage3%
50
Construction cost3%
83
Gas pipeline2%
97
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Hinds, ranked by DC Readiness.

Sites near EC Near Rex Brown
SiteTypeVoltageCapacityQueue waitScore
LAKEOVERSubstation-Adjacent500 kV1,000 MW2.8 yrs66.6
RAY BRASWELLSubstation-Adjacent500 kV1,000 MW2.8 yrs65.7
REX BROWN 230KVSubstation-Adjacent230 kV300 MW2.8 yrs64.4
KINGSWOODSubstation-Adjacent230 kV300 MW2.8 yrs61.5
UNKNOWN110121Substation-Adjacent230 kV300 MW2.8 yrs61.5
TAP145961Substation-Adjacent230 kV300 MW2.8 yrs61.4
UNKNOWN110157Substation-Adjacent230 kV300 MW2.8 yrs61.4
SOUTHWEST JACKSONSubstation-Adjacent230 kV300 MW2.8 yrs61.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.