Greenfield (CROW RIVER - BIG SWAN) is a greenfield datacenter candidate site in Wright County, Minnesota, scoring 51.7/100 DC Readiness — 46th of 53 scored sites in the county. Its nearest substation is CROW RIVER. It sits in the MISO grid region and the WRIGHT-HENNEPIN COOP ELEC ASSN service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Incentives available; large-load tariffs emerging.
Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.
Site location
Get alerts
Track Greenfield (CROW RIVER - BIG SWAN)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Greenfield (CROW RIVER - BIG SWAN) compare with other sites in Wright County?
Greenfield (CROW RIVER - BIG SWAN) ranks 46th of 53 scored candidate sites in Wright County. Its 51.7/100 is roughly in line with the county average of 55.5. It is roughly in line with the Minnesota average of 55.7 and roughly in line with the national average of 53.2.
Against the Minnesota average, its strongest sub-score is natural hazard (75 vs 74) and its weakest is power availability (28 vs 39). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Greenfield (CROW RIVER - BIG SWAN) to power, fiber and other datacenters?
The nearest mapped substation, CROW RIVER, is the closest grid connection point on record and operates at 115 kV. The nearest located transmission bottleneck is West_Memphis_AT1_161_500kV_flo_Sans_Souci_Driver (MISO), 61 miles away. For connectivity, the nearest internet exchange facility is Flexential - Minneapolis/Chaska (MSP01) at 26.6 miles. 18 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Flexential Minneapolis - Chaska, 26.6 miles away.
What are the flood, water and hazard risks at Greenfield (CROW RIVER - BIG SWAN)?
At the county level, FEMA's National Risk Index rates Wright County "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Wright County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| DICKINSON | Substation-Adjacent | 400 kV | 600 MW | 4.3 yrs | 65.9 |
| EC Coal Wright County | Greenfield | — | — | 4.3 yrs | 60.8 |
| Lindenfelser Landfill | Brownfield | 115 kV | — | 4.3 yrs | 60.5 |
| EC Near Delano | Greenfield | — | — | 4.3 yrs | 59.4 |
| EC Near Delano | Greenfield | — | — | 4.3 yrs | 59.4 |
| EC Near Delano | Greenfield | — | — | 4.3 yrs | 59.3 |
| EC Near Delano | Greenfield | — | — | 4.3 yrs | 59.2 |
| EC Near Delano | Greenfield | — | — | 4.3 yrs | 59.1 |
Greenfield (CROW RIVER - BIG SWAN): common questions
What is the DC Readiness score of Greenfield (CROW RIVER - BIG SWAN)?
Greenfield (CROW RIVER - BIG SWAN) scores 51.7/100 on the GridCensus DC Readiness scale, rated fair. It ranks 46th of 53 scored sites in Wright County. The Wright County average is 55.5 and the Minnesota average is 55.7.
What is the nearest substation to Greenfield (CROW RIVER - BIG SWAN)?
The nearest mapped substation is CROW RIVER, at 115 kV. GridCensus catalogs 100 MW of candidate capacity for the site.
Which electric utility serves Greenfield (CROW RIVER - BIG SWAN)?
WRIGHT-HENNEPIN COOP ELEC ASSN (cooperative) holds the retail service territory that contains the site.
What grid region is Greenfield (CROW RIVER - BIG SWAN) in?
Greenfield (CROW RIVER - BIG SWAN) is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.
How far is Greenfield (CROW RIVER - BIG SWAN) from an internet exchange?
The nearest internet exchange facility is Flexential - Minneapolis/Chaska (MSP01), about 26.6 miles away; 18 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Greenfield (CROW RIVER - BIG SWAN), Wright County, MN”, https://gridcensus.com/datacenter-sites/minnesota/wright-county/greenfield-crow-river-big-swan-89dd894e (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Greenfield (CROW RIVER - BIG SWAN), Wright County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.