Skip to content
Gridcensus

EC Near Sherburne County

Greenfield

Sherburne, Minnesota · MISO

DC Readiness
56.6
Good / 100

EC Near Sherburne County is a greenfield datacenter candidate site in Sherburne, Minnesota, interconnecting through MISO. It screens at 56.6/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.12¢/kWh
UtilityWRIGHT-HENNEPIN COOP ELEC ASSNcooperativemoderate to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth127
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDataBank Minneapolis (MSP3)
IXP distance26.7 mi
Fiber providers10
Fiber coverage27.0%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance239.1 mi

Site characteristics

Site typeGreenfield
Land contactSherburne County Assessor
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest
Former usenear retired coal plant (10km)

Risk & environment

Environmental constraintLow (15/100)
Flood zoneZone X
Water stress (WRI)0.40
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index109.6 (avg 100)

Location context

Nearest datacenterDataBank
DC distance26.6 mi
Nearest rail3.4 mi
Nearest gas pipeline4.6 mi
Nearest fiber route230.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.94¢/kWh
Industrial electricity9.05¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$7,181

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Sherburne County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
51
Fiber connectivity12%
58
Energy cost10%
87
Water risk7%
92
Natural hazard6%
65
Buildability7%
45
Labor market4%
50
DC cluster4%
60
Land / acreage3%
45
Construction cost3%
59
Gas pipeline2%
85
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Sherburne, ranked by DC Readiness.

Sites near EC Near Sherburne County
SiteTypeVoltageCapacityQueue waitScore
SHERBURNE COUNTYSubstation-Adjacent345 kV600 MW2.8 yrs67.5
ELK RIVERSubstation-Adjacent230 kV300 MW2.8 yrs64.4
MONTICELLOSubstation-Adjacent345 kV600 MW2.8 yrs63.5
EC Near Elk River City ofGreenfield——1.4 yrs61.2
EC Near Elk River City ofGreenfield——1.4 yrs60.8
EC Near Elk River City ofGreenfield——1.4 yrs60.6
EC Near Elk River City ofGreenfield——1.4 yrs60.6
EC Near Elk River City ofGreenfield——1.4 yrs60.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Sherburne County, Sherburne. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.