Skip to content
Gridcensus

OZ Nobles

Greenfield

Nobles County, Minnesota · MISO

DC Readiness
61.6
Good / 100

OZ Nobles is a greenfield datacenter candidate site in Nobles County, Minnesota, interconnecting through MISO. It screens at 61.6/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.13¢/kWh
UtilityCITY OF WORTHINGTON - (MN)municipal

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth127
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPSouth Spencer Aureon hut
IXP distance43.7 mi
Fiber providers8
Fiber coverage43.8%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance165.8 mi

Site characteristics

Site typeGreenfield
Land contactNobles County Assessor
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index78.8 (avg 100)

Location context

Nearest datacenterSouth Spencer Aureon hut
DC distance43.7 mi
Nearest rail1.1 mi
Nearest gas pipeline2.6 mi
Nearest fiber route70.9 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.92¢/kWh
Industrial electricity8.47¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$8,605

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Nobles

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
51
Fiber connectivity12%
62
Energy cost10%
87
Water risk7%
93
Natural hazard6%
75
Buildability7%
90
Labor market4%
50
DC cluster4%
45
Land / acreage3%
60
Construction cost3%
84
Gas pipeline2%
92
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Nobles County, ranked by DC Readiness.

Sites near OZ Nobles
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN129783Substation-Adjacent345 kV600 MW2.8 yrs62.1
UNKNOWN129796Substation-Adjacent161 kV100 MW2.8 yrs56.9
Greenfield (UNKNOWN129783 - LAKEFIELD JUNC)Greenfield345 kV600 MW2.8 yrs56.3
UNKNOWN129797Substation-Adjacent69 kV50 MW2.8 yrs54.5
UNKNOWN130037Substation-Adjacent69 kV50 MW2.8 yrs54.5
TAP138030Substation-Adjacent69 kV50 MW2.8 yrs54.4
TAP171120Substation-Adjacent69 kV50 MW2.8 yrs54.4
TAP138029Substation-Adjacent69 kV50 MW2.8 yrs54.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Nobles, Nobles County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.