Greenfield (LITTLEFORK - TAP176211)

Greenfield

Koochiching, Minnesota · MISO

DC Readiness
54.0
Fair / 100

Greenfield (LITTLEFORK - TAP176211) is a greenfield datacenter candidate site in Koochiching, Minnesota, interconnecting through MISO. It screens at 54.0/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationLITTLEFORK
Substation voltage230 kV
Available capacity300 MW
UtilityNORTH STAR ELECTRIC COOP, INCnot available

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth127
Avg queue wait2.8 yrs

Connectivity

Nearest IXPark data centers - Duluth, MN
IXP distance123.8 mi
Fiber providers6
Fiber coverage57.1%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score75/100

Location context

Nearest datacenterArk Duluth Data Center
DC distance123.8 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.14¢/kWh
Industrial electricity19.47¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$2,595

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (LITTLEFORK - TAP176211)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power20%
45
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Koochiching, ranked by DC Readiness.

Sites near Greenfield (LITTLEFORK - TAP176211)
SiteTypeVoltageCapacityQueue waitScore
LITTLEFORKSubstation-Adjacent230 kV300 MW2.8 yrs60.3
Greenfield (IRON RANGE - None)Greenfield500 kV1,000 MW2.8 yrs58.3
Greenfield (IRON RANGE - None)Greenfield500 kV1,000 MW2.8 yrs58.3
Greenfield (IRON RANGE - None)Greenfield500 kV1,000 MW2.8 yrs57.8
Greenfield (IRON RANGE - None)Greenfield500 kV1,000 MW2.8 yrs57.8
Greenfield (IRON RANGE - None)Greenfield500 kV1,000 MW2.8 yrs57.5
Greenfield (IRON RANGE - None)Greenfield500 kV1,000 MW2.8 yrs57.3
OZ KoochichingGreenfield1.4 yrs57.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.