EC Coal Wayne County

Greenfield

Wayne County, Michigan · PJM

DC Readiness
63.8
Good / 100

EC Coal Wayne County is a greenfield datacenter candidate site in Wayne County, Michigan, interconnecting through PJM. It screens at 63.8/100 DC Readiness and a 2.2 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_ATSI
Wholesale LMP$42.97/MWh
Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth11
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPRaeden Michigan 1
IXP distance17.8 mi
Fiber providers16
Fiber coverage34.2%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance147.9 mi

Site characteristics

Site typeGreenfield
Parcel ownerWYANDOTTE MUNICIPAL SERV COMM
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space
Former usecoal adjacent

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteTRUST FOR PUBLIC LAND
Hazard sub-score65/100
Construction cost index111.6 (avg 100)

Location context

Nearest datacenterComcast
DC distance8.2 mi
Nearest rail0.6 mi
Nearest gas pipeline3.3 mi
Nearest fiber route165.6 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity8.95¢/kWh
Industrial electricity4.86¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$20,415

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
56
Fiber connectivity12%
71
Energy cost10%
81
Water risk8%
94
Natural hazard8%
65
Buildability7%
90
Labor market4%
50
DC cluster4%
85
Land / acreage3%
38
Construction cost3%
57
Gas pipeline2%
89
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Wayne County, ranked by DC Readiness.

Sites near EC Coal Wayne County
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN130399Substation-Adjacent230 kV300 MW2.2 yrs75.5
UNKNOWN128894Substation-Adjacent230 kV300 MW2.2 yrs75.4
TAP139995Substation-Adjacent230 kV300 MW2.2 yrs75.2
UNKNOWN144597Substation-Adjacent230 kV300 MW2.2 yrs75.2
UNKNOWN128440Substation-Adjacent230 kV300 MW2.2 yrs75.0
UNKNOWN128437Substation-Adjacent230 kV300 MW2.2 yrs74.9
TAP139989Substation-Adjacent230 kV300 MW2.2 yrs74.9
UNKNOWN128433Substation-Adjacent230 kV300 MW2.2 yrs74.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Coal Wayne County, Wayne County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.