EC Near East. Michigan Univ. Heating Plant

Greenfield

Washtenaw County, Michigan · PJM

DC Readiness
60.5
Good / 100

EC Near East. Michigan Univ. Heating Plant is a greenfield datacenter candidate site in Washtenaw County, Michigan, interconnecting through PJM. It screens at 60.5/100 DC Readiness and a 2.2 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_ATSI
Wholesale LMP$42.97/MWh
Utility commercial rate0.09¢/kWh
UtilityDTE ELECTRIC COMPANYinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load contract terms; MI DC tax exemption (2025) · 15 yr

Speed to power

Interconnection outlookFavorable
≈ 2.2 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionPJM
Queue depth17
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPSynergy Fiber
IXP distance8.7 mi
Fiber providers17
Fiber coverage41.5%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance160.8 mi

Site characteristics

Site typeGreenfield
Land contactWashtenaw County Assessor
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity
Former usenear retired gas plant (5km)

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteMICHIGAN EBY BROWN CO LLC
Hazard sub-score65/100
Construction cost index100.3 (avg 100)

Location context

Nearest datacenterUS Signal DC
DC distance6.4 mi
Nearest rail0.3 mi
Nearest gas pipeline0.3 mi
Nearest fiber route175.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity9.37¢/kWh
Industrial electricity4.89¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$7,616

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near East. Michigan Univ. Heating Plant

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
52
Fiber connectivity12%
37
Energy cost10%
81
Water risk7%
94
Natural hazard6%
65
Buildability7%
100
Labor market4%
50
DC cluster4%
85
Land / acreage3%
43
Construction cost3%
66
Gas pipeline2%
99
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Washtenaw County, ranked by DC Readiness.

Sites near EC Near East. Michigan Univ. Heating Plant
SiteTypeVoltageCapacityQueue waitScore
MILANSubstation-Adjacent345 kV600 MW3.8 yrs67.7
COVENTRYSubstation-Adjacent345 kV600 MW3.8 yrs67.4
EC Near University of MichiganGreenfield——2.2 yrs66.6
EC Near East. Michigan Univ. Heating PlantGreenfield——2.2 yrs66.2
MAJESTICSubstation-Adjacent345 kV600 MW3.8 yrs66.1
OZ WashtenawGreenfield——2.2 yrs66.0
OZ WashtenawGreenfield——2.2 yrs65.5
EC Near GRS LyonGreenfield——2.2 yrs64.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near East. Michigan Univ. Heating Plant, Washtenaw County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.