Skip to content
Gridcensus

EC Near Sturgis City Diesel Plant

Greenfield

St. Joseph County, Michigan · PJM

DC Readiness
62.3
Good / 100

EC Near Sturgis City Diesel Plant is a greenfield datacenter candidate site in St. Joseph County, Michigan, interconnecting through PJM. It screens at 62.3/100 DC Readiness and a 2.2 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_ATSI
Wholesale LMP$42.97/MWh
Utility commercial rate0.11¢/kWh
UtilityCONSUMERS ENERGY COinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load contract terms; MI DC sales/use-tax exemption (2025) · 15 yr

Speed to power

Interconnection outlookFavorable
≈ 2.2 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionPJM
Queue depth17
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPLagrange CO
IXP distance17.2 mi
Fiber providers10
Fiber coverage75.7%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance113.4 mi

Site characteristics

Site typeGreenfield
Land contactSt Joseph County Assessor
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops
Former usenear retired oil plant (10km)

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index100.3 (avg 100)

Location context

Nearest datacenterLagrange CO
DC distance17.2 mi
Nearest rail5.5 mi
Nearest gas pipeline10.5 mi
Nearest fiber route122.3 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.65¢/kWh
Industrial electricity5.23¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$7,367

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Sturgis City Diesel Plant

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
52
Fiber connectivity12%
79
Energy cost10%
81
Water risk7%
94
Natural hazard6%
75
Buildability7%
65
Labor market4%
50
DC cluster4%
65
Land / acreage3%
43
Construction cost3%
66
Gas pipeline2%
66
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in St. Joseph County, ranked by DC Readiness.

Sites near EC Near Sturgis City Diesel Plant
SiteTypeVoltageCapacityQueue waitScore
EC Near Sturgis City Diesel PlantGreenfield——2.2 yrs66.2
EC Near Sturgis City Diesel PlantGreenfield——2.2 yrs65.1
EC Near Sturgis City Diesel PlantGreenfield——2.2 yrs64.8
EC Near Sturgis City Diesel PlantGreenfield——2.2 yrs64.2
EC Near Sturgis City Diesel PlantGreenfield——2.2 yrs64.2
EC Near Sturgis City Diesel PlantGreenfield——2.2 yrs64.0
EC Near Sturgis City Diesel PlantGreenfield——2.2 yrs62.7
EC Near Sturgis City Diesel PlantGreenfield——2.2 yrs62.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near Sturgis City Diesel Plant, St. Joseph County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.