EC Near St Clair

Greenfield

St. Clair County, Michigan · PJM

DC Readiness
61.5
Good / 100

EC Near St Clair is a greenfield datacenter candidate site in St. Clair County, Michigan, interconnecting through PJM. It screens at 61.5/100 DC Readiness and a 2.2 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_ATSI
Wholesale LMP$42.97/MWh
Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth11
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPManagedWay TYM2
IXP distance29.9 mi
Fiber providers9
Fiber coverage37.0%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance194.8 mi

Site characteristics

Site typeGreenfield
Parcel ownerCONSUMERS ENERGY CO
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay
Former usenear retired coal plant (10km)

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index100.3 (avg 100)

Location context

Nearest datacenterChick-fil-A Hiring Center
DC distance22.1 mi
Nearest rail5.2 mi
Nearest gas pipeline1.6 mi
Nearest fiber route114.9 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity8.81¢/kWh
Industrial electricity4.74¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$5,814

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
56
Fiber connectivity12%
58
Energy cost10%
81
Water risk8%
92
Natural hazard8%
75
Buildability7%
75
Labor market4%
50
DC cluster4%
60
Land / acreage3%
46
Construction cost3%
66
Gas pipeline2%
95
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in St. Clair County, ranked by DC Readiness.

Sites near EC Near St Clair
SiteTypeVoltageCapacityQueue waitScore
GREENWOOD SOLAR FARMSubstation-Adjacent345 kV600 MW2.2 yrs74.3
FITZSubstation-Adjacent345 kV600 MW2.2 yrs71.7
TAP139992Substation-Adjacent345 kV600 MW2.2 yrs71.5
ST. CLAIRSubstation-Adjacent345 kV600 MW2.2 yrs70.9
GREENWOODSubstation-Adjacent345 kV600 MW2.2 yrs70.3
UNKNOWN163117Substation-Adjacent120 kV100 MW2.2 yrs67.7
TAP146114Substation-Adjacent120 kV100 MW2.2 yrs67.5
UNKNOWN128476Substation-Adjacent138 kV100 MW2.2 yrs67.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near St Clair, St. Clair County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.