Skip to content
Gridcensus

EC Near Scottville

Greenfield

Mason County, Michigan · PJM

DC Readiness
50.8
Fair / 100

EC Near Scottville is a greenfield datacenter candidate site in Mason County, Michigan, interconnecting through PJM. It screens at 50.8/100 DC Readiness and a 2.2 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_ATSI
Wholesale LMP$42.97/MWh
Utility commercial rate0.11¢/kWh
UtilityDTE ELECTRIC COMPANYinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load contract terms; MI DC tax exemption (2025) · 15 yr

Speed to power

Interconnection outlookFavorable
≈ 2.2 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionPJM
Queue depth17
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXP123.NET - DC4 - 400 76th St SW
IXP distance89.8 mi
Fiber providers7
Fiber coverage34.6%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance164.2 mi

Site characteristics

Site typeGreenfield
Land contactMason County Assessor
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops
Former usenear retired oil plant (10km)

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index100.3 (avg 100)

Location context

Nearest datacenterManagedWay BYK1
DC distance89.8 mi
Nearest rail4.8 mi
Nearest gas pipeline0.9 mi
Nearest fiber route109.8 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.46¢/kWh
Industrial electricity6.24¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$4,628

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Scottville

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
15
Energy cost10%
82
Water risk7%
94
Natural hazard6%
75
Buildability7%
65
Labor market4%
50
DC cluster4%
25
Land / acreage3%
43
Construction cost3%
66
Gas pipeline2%
97
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Mason County, ranked by DC Readiness.

Sites near EC Near Scottville
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN128917Substation-Adjacent345 kV600 MW3.8 yrs60.1
LUDINGTONSubstation-Adjacent345 kV600 MW3.8 yrs59.9
OZ MasonGreenfield——2.2 yrs58.3
EC Near ScottvilleGreenfield——2.2 yrs57.6
EC Near ScottvilleGreenfield——2.2 yrs56.6
ScottvilleBrownfield—4 MW2.2 yrs56.0
EC Near ScottvilleGreenfield——2.2 yrs55.8
EC Near ScottvilleGreenfield——2.2 yrs55.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Scottville, Mason County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.