Greenfield (IRON GROVE - TAP138649)

Greenfield

Iron County, Michigan · PJM

DC Readiness
46.0
Fair / 100

Greenfield (IRON GROVE - TAP138649) is a greenfield datacenter candidate site in Iron County, Michigan, interconnecting through PJM. It screens at 46.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationIRON GROVE
Substation voltage138 kV
Available capacity100 MW
UtilityBAYFIELD ELECTRIC COOP, INCnot available

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth17
Avg queue wait3.8 yrs

Connectivity

Nearest IXPMI Tech - Main Campus
IXP distance77.4 mi
Fiber providers8
Fiber coverage24.5%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterMI Tech - Main Campus
DC distance77.4 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity15.08¢/kWh
Industrial electricity5.54¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$4,200

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 4 nearby

Get alerts

Track Greenfield (IRON GROVE - TAP138649)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
41
Fiber connectivity12%
19
Energy cost10%
50
Water risk7%
94
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Iron County, ranked by DC Readiness.

Sites near Greenfield (IRON GROVE - TAP138649)
SiteTypeVoltageCapacityQueue waitScore
OZ IronGreenfield——2.2 yrs55.9
IRON GROVESubstation-Adjacent138 kV100 MW3.8 yrs55.8
UNKNOWN128830Substation-Adjacent69 kV50 MW3.8 yrs54.1
EC FFE Iron CountyGreenfield——2.2 yrs52.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (IRON GROVE - TAP138649), Iron County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.