EC Coal Delta County
GreenfieldDelta County, Michigan · MISO
At a glance
EC Coal Delta County is a greenfield datacenter candidate site in Delta County, Michigan, scoring 52.4/100 DC Readiness — 27th of 59 scored sites in the county. It sits in the MISO grid region and the UPPER PENINSULA POWER COMPANY service territory, where interconnection has averaged 2.2 years from request to operation.
Power & interconnection
Speed to power
Shorter queues and healthier completion here — a faster path to energization than the national norm.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.
Site location
Get alerts
Track EC Coal Delta County
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does EC Coal Delta County compare with other sites in Delta County?
EC Coal Delta County ranks 27th of 59 scored candidate sites in Delta County. Its 52.4/100 is roughly in line with the county average of 54.1. It is roughly in line with the Michigan average of 55.2 and roughly in line with the national average of 53.2.
Against the Michigan average, its strongest sub-score is speed to power (54 vs 54) and its weakest is water (79 vs 93). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is EC Coal Delta County to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is Ethoplex Edge DC - Green Bay at 96.3 miles. 8 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Ethoplex Edge DC - Green Bay, 96.3 miles away.
What are the flood, water and hazard risks at EC Coal Delta County?
The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). WRI rates baseline water stress at 0.30 on a 0–5 scale. Mapped wetlands (National Wetlands Inventory) are present on the parcel. At the county level, FEMA's National Risk Index rates Delta County "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Delta County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Coal Delta County | Greenfield | — | — | 2.2 yrs | 61.0 |
| EC Coal Delta County | Greenfield | — | — | 2.2 yrs | 60.4 |
| EC Coal Delta County | Greenfield | — | — | 2.2 yrs | 60.4 |
| CHANDLER | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 58.3 |
| ATC PERKINS | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 58.2 |
| EC Coal Delta County | Greenfield | — | — | 2.2 yrs | 57.9 |
| UNKNOWN128979 | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 57.7 |
| EC Coal Delta County | Greenfield | — | — | 2.2 yrs | 57.0 |
EC Coal Delta County: common questions
What is the DC Readiness score of EC Coal Delta County?
EC Coal Delta County scores 52.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 27th of 59 scored sites in Delta County. The Delta County average is 54.1 and the Michigan average is 55.2.
Which electric utility serves EC Coal Delta County?
UPPER PENINSULA POWER COMPANY (investor owned) holds the retail service territory that contains the site; its holding company is INTEGRYS ENERGY GROUP.
What grid region is EC Coal Delta County in?
EC Coal Delta County is in the MISO region. Projects interconnecting there have averaged a 2.2-year wait from queue request to operation.
Is EC Coal Delta County in a flood zone?
The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).
Who owns EC Coal Delta County?
Parcel records list the owner as CONSUMERS ENERGY CO (private land).
How far is EC Coal Delta County from an internet exchange?
The nearest internet exchange facility is Ethoplex Edge DC - Green Bay, about 96.3 miles away; 8 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “EC Coal Delta County, Delta County, MI”, https://gridcensus.com/datacenter-sites/michigan/delta-county/ec-coal-delta-county-4e442345 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for EC Coal Delta County, Delta County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.