Coldwater Board of Public Utilities Solar Field Park
BrownfieldBranch County, Michigan · MISO
Coldwater Board of Public Utilities Solar Field Park is a brownfield datacenter candidate site in Branch County, Michigan, interconnecting through MISO. It screens at 64.1/100 DC Readiness with a catalogued 1 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Shorter queues and healthier completion here — a faster path to energization than the national norm.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.
Site location
Get alerts
Track Coldwater Board of Public Utilities Solar Field Park
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Branch County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC FFE Branch County | Greenfield | — | — | 2.2 yrs | 59.3 |
| BATAVIA | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.9 |
| TAP145694 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.8 |
| EC Coal Branch County | Greenfield | — | — | 2.2 yrs | 56.5 |
| UNKNOWN128961 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 55.7 |
| NEWTON | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 55.5 |
| EC Coal Branch County | Greenfield | — | — | 2.2 yrs | 52.1 |
| Skaggs Assisted Living | Industrial | — | — | 3.8 yrs | 51.2 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Coldwater Board of Public Utilities Solar Field Park, Branch County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.