Mine Site

Former Mine

Nantucket, Massachusetts · ISO-NE

DC Readiness
42.4
Fair / 100

Mine Site is a former mine datacenter candidate site in Nantucket, Massachusetts, interconnecting through ISO-NE. It screens at 42.4/100 DC Readiness and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

Interconnection outlookModerate
≈ 3.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionISO-NE
Queue depth25
Avg queue wait3.9 yrs

Connectivity

Nearest IXPColoSpace - Rockland, MA
IXP distance73.9 mi
Fiber providers1
Fiber coverage0.7%

Site characteristics

Site typeFormer Mine
Former useMining: SandAndGravel; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterColoSpace - Rockland, MA
DC distance73.9 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity21.30¢/kWh
Industrial electricity20.98¢/kWh
Cooling degree days600
Heating degree days5,900
Land price / acre$14,302

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
37
Fiber connectivity12%
29
Energy cost10%
50
Water risk7%
88
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
30
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Nantucket, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
EC Near Nantucket HybridGreenfield——3.5 yrs49.1
EC Near Nantucket HybridGreenfield——3.5 yrs48.8
EC Near Nantucket HybridGreenfield——3.5 yrs46.9
EC Near Nantucket HybridGreenfield——3.5 yrs46.5
Nantucket HybridBrownfield—20 MW3.5 yrs45.9
EC Near Nantucket HybridGreenfield——3.5 yrs45.6
EC Near Nantucket HybridGreenfield——3.5 yrs43.8
EC Near Nantucket HybridGreenfield——3.5 yrs43.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.