Ferry Street Site

Industrial

Hampshire County, Massachusetts · ISO-NE

DC Readiness
51.9
Fair / 100

Ferry Street Site is an industrial datacenter candidate site in Hampshire County, Massachusetts, interconnecting through ISO-NE. It screens at 51.9/100 DC Readiness and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionISO-NE
Queue depth48
Avg queue wait3.9 yrs

Connectivity

Nearest IXPCogent Springfield MA
IXP distance11.7 mi
Fiber providers8
Fiber coverage41.2%

Site characteristics

Site typeIndustrial
Land contactHampshire County County Assessor

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterCogent Springfield MA
DC distance11.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity16.50¢/kWh
Industrial electricity15.84¢/kWh
Cooling degree days600
Heating degree days5,900
Land price / acre$10,568

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
35
Fiber connectivity12%
77
Energy cost10%
50
Water risk8%
88
Natural hazard8%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
30
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Hampshire County, ranked by DC Readiness.

Sites near Ferry Street Site
SiteTypeVoltageCapacityQueue waitScore
OZ HampshireGreenfield3.5 yrs59.9
Belchertown Road Landfill SolarBrownfield115 kV4 MW3.9 yrs59.3
OZ HampshireGreenfield3.5 yrs58.7
Eastham LandfillBrownfield115 kV1 MW3.9 yrs57.9
UNKNOWN133478Substation-Adjacent115 kV100 MW3.9 yrs56.3
UNKNOWN140782Substation-Adjacent115 kV100 MW3.9 yrs56.2
FIVE CORNERSSubstation-Adjacent115 kV100 MW3.9 yrs56.2
EC Coal Hampshire CountyGreenfield3.5 yrs55.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.