Skip to content
Gridcensus

UNKNOWN133477

Substation-Adjacent

Hampden County, Massachusetts · ISO-NE

DC Readiness
57.5
Good / 100

UNKNOWN133477 is a substation-adjacent datacenter candidate site in Hampden County, Massachusetts, interconnecting through ISO-NE. It screens at 57.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN133477
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionISO-NE
Queue depth48
Avg queue wait3.9 yrs

Connectivity

Nearest IXPCogent Springfield MA
IXP distance5.9 mi
Fiber providers10
Fiber coverage32.0%

Site characteristics

Former usehydro
Existing capacity1 MW

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterCogent Springfield MA
DC distance5.9 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity16.80¢/kWh
Industrial electricity15.72¢/kWh
Cooling degree days600
Heating degree days5,900
Land price / acre$13,611

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
41
Fiber connectivity12%
67
Energy cost10%
50
Water risk8%
88
Natural hazard8%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
30
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Hampden County, ranked by DC Readiness.

Sites near UNKNOWN133477
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN133485Substation-Adjacent345 kV600 MW3.9 yrs66.1
AGAWAMSubstation-Adjacent345 kV600 MW3.9 yrs64.2
LUDLOWSubstation-Adjacent345 kV600 MW3.9 yrs62.2
Indian Orchard Solar FacilityBrownfield2 MW3.9 yrs61.5
OZ HampdenGreenfield3.5 yrs60.4
Former Grasso LandfillBrownfield115 kV2 MW3.9 yrs60.2
EC Near Chicopee ElectricGreenfield3.5 yrs60.1
OZ HampdenGreenfield3.5 yrs60.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN133477, Hampden County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.