Monroe County Industrial Park

Shovel-Ready

Monroe County, Kentucky · PJM

DC Readiness
49.4
Fair / 100

Monroe County Industrial Park is a shovel-ready datacenter candidate site in Monroe County, Kentucky, interconnecting through PJM. It screens at 49.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth221

Connectivity

Nearest IXPLost River Data Center
IXP distance46.8 mi

Site characteristics

Site typeShovel-Ready
Acreage40 ac
Former useShovel-ready

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterMeta Gallatin Data Center
DC distance43.9 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.97¢/kWh
Industrial electricity6.56¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$4,027

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
50
Fiber connectivity12%
38
Energy cost10%
50
Water risk8%
92
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Monroe County, ranked by DC Readiness.

Sites near Monroe County Industrial Park
SiteTypeVoltageCapacityQueue waitScore
TOMPKINSVILLESubstation-Adjacent161 kV100 MW3.6 yrs63.1
TOMPKINSVILLE PSSubstation-Adjacent161 kV100 MW3.6 yrs62.2
Greenfield (LAFAYETTE - SUMMER SHADE)Greenfield161 kV100 MW3.7 yrs61.4
Greenfield (LAFAYETTE - SUMMER SHADE)Greenfield161 kV100 MW3.7 yrs59.7
TAP170344Substation-Adjacent161 kV100 MW3.6 yrs58.5
Greenfield (TOMPKINSVILLE PS - TAP170344)Greenfield161 kV100 MW3.6 yrs57.1
Capp Harlan Industrial ParkShovel-Ready49.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.