US Center Foundation BTA Site #2

Industrial

Smith County, Kansas · SPP

DC Readiness
50.2
Fair / 100

US Center Foundation BTA Site #2 is an industrial datacenter candidate site in Smith County, Kansas, interconnecting through SPP. It screens at 50.2/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckSMKSUMPOSAXT · 149 km (SPP)
UtilityPRAIRIE LAND ELECTRIC COOP INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth64
Avg queue wait3.3 yrs

Connectivity

Nearest IXPBeloit-NOC
IXP distance33.8 mi
Fiber providers2
Fiber coverage93.2%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterBeloit-NOC
DC distance33.8 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity13.43¢/kWh
Industrial electricity7.63¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$2,263

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track US Center Foundation BTA Site #2

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
54
Fiber connectivity12%
74
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Smith County, ranked by DC Readiness.

Sites near US Center Foundation BTA Site #2
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN118126Substation-Adjacent115 kV100 MW3.3 yrs56.1
Planter's Lounge BTAIndustrial——3.3 yrs50.2
Clark BuildingIndustrial——3.3 yrs50.2
Greenfield (UNKNOWN118126 - UNKNOWN119758)Greenfield115 kV100 MW3.3 yrs50.2
US Center Foundation BTA Site #1Industrial——3.3 yrs50.2
Lebanon Community Center BTAIndustrial——3.3 yrs50.2
Mine SiteFormer Mine——3.3 yrs50.2
US Center Foundation BTA Site #3Industrial——3.3 yrs49.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.