US Center Foundation BTA Site #1
IndustrialSmith County, Kansas · SPP
US Center Foundation BTA Site #1 is an industrial datacenter candidate site in Smith County, Kansas, interconnecting through SPP. It screens at 47.7/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.
Site location
Get alerts
Track US Center Foundation BTA Site #1
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Smith County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN118126 | Substation-Adjacent | 115 kV | 100 MW | 3.3 yrs | 53.6 |
| Planter's Lounge BTA | Industrial | — | — | 3.3 yrs | 47.7 |
| Lebanon Community Center BTA | Industrial | — | — | 3.3 yrs | 47.7 |
| US Center Foundation BTA Site #2 | Industrial | — | — | 3.3 yrs | 47.7 |
| Mine Site | Former Mine | — | — | 3.3 yrs | 47.6 |
| Clark Building | Industrial | — | — | 3.3 yrs | 47.6 |
| Greenfield (UNKNOWN118126 - UNKNOWN119758) | Greenfield | 115 kV | 100 MW | 3.3 yrs | 47.6 |
| US Center Foundation BTA Site #3 | Industrial | — | — | 3.3 yrs | 47.4 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for US Center Foundation BTA Site #1, Smith County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.