DC Readiness
48.4
Fair / 100

At a glance

Bentley Well Field PWS #4 is an industrial datacenter candidate site in Sedgwick, Kansas, scoring 48.4/100 DC Readiness — 273rd of 273 scored sites in the county. It sits in the SPP grid region and the EVERGY KANSAS CENTRAL, INC service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

Nearest grid bottleneckTP1136_32015 · 9 km (SPP)
UtilityEVERGY KANSAS CENTRAL, INCinvestor ownedfavorable to large load · terms ≥ 75 MWLarge Load Power Service (LLPS, ≥75 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth59
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPBeloit-NOC
IXP distance116.3 mi
Fiber providers11
Fiber coverage87.4%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintLow (25/100)
Flood zoneZone AE (SFHA)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score50/100

Location context

Nearest datacenterSC DC
DC distance70.3 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.24¢/kWh
Industrial electricity7.71¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$3,923

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Bentley Well Field PWS #4

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Bentley Well Field PWS #4 compare with other sites in Sedgwick?

Bentley Well Field PWS #4 ranks 273rd of 273 scored candidate sites in Sedgwick. Its 48.4/100 is roughly in line with the county average of 51.5. It is roughly in line with the Kansas average of 53.2 and roughly in line with the national average of 53.2.

Against the Kansas average, its strongest sub-score is fiber connectivity (72 vs 71) and its weakest is natural hazard (50 vs 64). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Bentley Well Field PWS #4 to power, fiber and other datacenters?

The nearest located transmission bottleneck is TP1136_32015 (SPP), 5 miles away. For connectivity, the nearest internet exchange facility is Beloit-NOC at 116.3 miles. 11 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is SC DC, 70.3 miles away.

What are the flood, water and hazard risks at Bentley Well Field PWS #4?

The site is in FEMA flood zone AE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding. At the county level, FEMA's National Risk Index rates Sedgwick "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
52
Natural hazard6%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Sedgwick, ranked by DC Readiness.

Sites near Bentley Well Field PWS #4
SiteTypeVoltageCapacityQueue waitScore
WICHITASubstation-Adjacent345 kV600 MW4.3 yrs65.3
UNKNOWN168685Substation-Adjacent345 kV600 MW4.3 yrs62.2
BENTONSubstation-Adjacent345 kV600 MW4.3 yrs61.7
EC Near Murray GillGreenfield——4.3 yrs59.9
OZ SedgwickGreenfield——4.3 yrs59.4
EC Near Wichita PlantGreenfield——4.3 yrs59.2
EC Near Wichita PlantGreenfield——4.3 yrs59.1
EC Near Gordon Evans Energy CenterGreenfield——4.3 yrs58.6

Bentley Well Field PWS #4: common questions

What is the DC Readiness score of Bentley Well Field PWS #4?

Bentley Well Field PWS #4 scores 48.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 273rd of 273 scored sites in Sedgwick. The Sedgwick average is 51.5 and the Kansas average is 53.2.

Which electric utility serves Bentley Well Field PWS #4?

EVERGY KANSAS CENTRAL, INC (investor owned) holds the retail service territory that contains the site; its holding company is WESTAR ENERGY INC.

What grid region is Bentley Well Field PWS #4 in?

Bentley Well Field PWS #4 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Is Bentley Well Field PWS #4 in a flood zone?

The site is in FEMA flood zone AE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding.

How far is Bentley Well Field PWS #4 from an internet exchange?

The nearest internet exchange facility is Beloit-NOC, about 116.3 miles away; 11 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Bentley Well Field PWS #4, Sedgwick, KS”, https://gridcensus.com/datacenter-sites/kansas/sedgwick/bentley-well-field-pws-4-18422f19 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Bentley Well Field PWS #4, Sedgwick is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.