OZ Woodbury

Greenfield

Woodbury County, Iowa · MISO

DC Readiness
63.5
Good / 100

OZ Woodbury is a greenfield datacenter candidate site in Woodbury County, Iowa, interconnecting through MISO. It screens at 63.5/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.08¢/kWh
UtilityMIDAMERICAN ENERGY COinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth112
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPLong Lines Secure Data Center
IXP distance2.3 mi
Fiber providers15
Fiber coverage86.4%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance90.3 mi

Site characteristics

Site typeGreenfield
Land contactWoodbury County Assessor
Land owner typeprivate
Buildability50.0/100

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteSIOUXLAND TRAILER SALES INC
Hazard sub-score60/100
Construction cost index89.1 (avg 100)

Location context

Nearest datacenterLong Lines Secure Data Center
DC distance2.3 mi
Nearest rail0.7 mi
Nearest gas pipeline5.0 mi
Nearest fiber route1.7 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.25¢/kWh
Industrial electricity6.61¢/kWh
Cooling degree days900
Heating degree days6,500
Land price / acre$8,352

Regulatory climate

Favorablestate posture · as of 2026-08

Strong incentives; utilities courting hyperscale load.

DC tax incentiveYes

Incentive detail: Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Woodbury

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
53
Fiber connectivity12%
97
Energy cost10%
85
Water risk7%
88
Natural hazard6%
60
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
54
Construction cost3%
76
Gas pipeline2%
84
Tax incentive1%
100
Climate / cooling1%
80

Nearby comparable sites

Other scored datacenter candidate sites in Woodbury County, ranked by DC Readiness.

Sites near OZ Woodbury
SiteTypeVoltageCapacityQueue waitScore
OZ WoodburyGreenfield——1.4 yrs66.5
EC Coal Woodbury CountyGreenfield——1.4 yrs66.1
EC Near George Neal NorthGreenfield——1.4 yrs64.3
EC Near George Neal NorthGreenfield——1.4 yrs64.0
EC Near George Neal NorthGreenfield——1.4 yrs63.7
EC Near George Neal NorthGreenfield——1.4 yrs63.6
EC Near George Neal NorthGreenfield——1.4 yrs63.1
EC Near George Neal NorthGreenfield——1.4 yrs63.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.