Greenfield (UNKNOWN130990 - FPL ENERGY STO)
GreenfieldStory, Iowa · MISO
At a glance
Greenfield (UNKNOWN130990 - FPL ENERGY STO) is a greenfield datacenter candidate site in Story, Iowa, scoring 53.9/100 DC Readiness — 34th of 46 scored sites in the county. Its nearest substation is UNKNOWN130990. It sits in the MISO grid region and the INTERSTATE POWER AND LIGHT CO service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Strong incentives; utilities courting hyperscale load.
Incentive detail: Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.
Site location
Get alerts
Track Greenfield (UNKNOWN130990 - FPL ENERGY STO)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Greenfield (UNKNOWN130990 - FPL ENERGY STO) compare with other sites in Story?
Greenfield (UNKNOWN130990 - FPL ENERGY STO) ranks 34th of 46 scored candidate sites in Story. Its 53.9/100 is roughly in line with the county average of 59.2. It is roughly in line with the Iowa average of 56.4 and roughly in line with the national average of 53.2.
Against the Iowa average, its strongest sub-score is fiber connectivity (80 vs 77) and its weakest is power availability (32 vs 37). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Greenfield (UNKNOWN130990 - FPL ENERGY STO) to power, fiber and other datacenters?
The nearest mapped substation, UNKNOWN130990, is the closest grid connection point on record and operates at 161 kV. The nearest located transmission bottleneck is ALW16X26_WAPELLO_TR91_TR91 (MISO), 91 miles away. For connectivity, the nearest internet exchange facility is InfoBunker at 21.3 miles. 16 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is InfoBunker, 21.3 miles away.
What are the flood, water and hazard risks at Greenfield (UNKNOWN130990 - FPL ENERGY STO)?
At the county level, FEMA's National Risk Index rates Story "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Story, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Iowa State University | Greenfield | — | — | 4.3 yrs | 65.4 |
| EC Near Iowa State University | Greenfield | — | — | 4.3 yrs | 65.2 |
| EC Near Iowa State University | Greenfield | — | — | 4.3 yrs | 64.2 |
| EC Near Iowa State University | Greenfield | — | — | 4.3 yrs | 63.0 |
| EC Near NCAH Central Utility Plant | Greenfield | — | — | 4.3 yrs | 62.7 |
| Iowa State University | Brownfield | — | 9 MW | 4.3 yrs | 62.4 |
| UNKNOWN130993 | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 62.3 |
| EC Near Iowa State University | Greenfield | — | — | 4.3 yrs | 62.3 |
Greenfield (UNKNOWN130990 - FPL ENERGY STO): common questions
What is the DC Readiness score of Greenfield (UNKNOWN130990 - FPL ENERGY STO)?
Greenfield (UNKNOWN130990 - FPL ENERGY STO) scores 53.9/100 on the GridCensus DC Readiness scale, rated fair. It ranks 34th of 46 scored sites in Story. The Story average is 59.2 and the Iowa average is 56.4.
What is the nearest substation to Greenfield (UNKNOWN130990 - FPL ENERGY STO)?
The nearest mapped substation is UNKNOWN130990, at 161 kV. GridCensus catalogs 100 MW of candidate capacity for the site.
Which electric utility serves Greenfield (UNKNOWN130990 - FPL ENERGY STO)?
INTERSTATE POWER AND LIGHT CO (investor owned) holds the retail service territory that contains the site; its holding company is ALLIANT ENERGY CORP.
What grid region is Greenfield (UNKNOWN130990 - FPL ENERGY STO) in?
Greenfield (UNKNOWN130990 - FPL ENERGY STO) is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.
How far is Greenfield (UNKNOWN130990 - FPL ENERGY STO) from an internet exchange?
The nearest internet exchange facility is InfoBunker, about 21.3 miles away; 16 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Greenfield (UNKNOWN130990 - FPL ENERGY STO), Story, IA”, https://gridcensus.com/datacenter-sites/iowa/story/greenfield-unknown130990-fpl-energy-sto-8e89abf2 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Greenfield (UNKNOWN130990 - FPL ENERGY STO), Story is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.