Skip to content
Gridcensus

EC Near Lansing

Greenfield

Allamakee, Iowa · MISO

DC Readiness
56.9
Good / 100

EC Near Lansing is a greenfield datacenter candidate site in Allamakee, Iowa, interconnecting through MISO. It screens at 56.9/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.13¢/kWh
UtilityINTERSTATE POWER AND LIGHT COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth112
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPUSSHC
IXP distance69.7 mi
Fiber providers8
Fiber coverage79.2%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance138.4 mi

Site characteristics

Site typeGreenfield
Land contactAllamakee County Assessor
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest
Former usenear retired coal plant (5km)

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index91.1 (avg 100)

Location context

Nearest datacenterUSSHC
DC distance69.7 mi
Nearest rail3.1 mi
Nearest gas pipeline5.1 mi
Nearest fiber route90.8 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.02¢/kWh
Industrial electricity8.14¢/kWh
Cooling degree days900
Heating degree days6,500
Land price / acre$7,375

Regulatory climate

Favorablestate posture · as of 2026-08

Strong incentives; utilities courting hyperscale load.

DC tax incentiveYes

Incentive detail: Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Lansing

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
53
Fiber connectivity12%
70
Energy cost10%
85
Water risk7%
88
Natural hazard6%
70
Buildability7%
45
Labor market4%
50
DC cluster4%
25
Land / acreage3%
39
Construction cost3%
74
Gas pipeline2%
84
Tax incentive1%
100
Climate / cooling1%
80

Nearby comparable sites

Other scored datacenter candidate sites in Allamakee, ranked by DC Readiness.

Sites near EC Near Lansing
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN130580Substation-Adjacent161 kV100 MW2.8 yrs60.0
EC Coal Allamakee CountyGreenfield——1.4 yrs59.3
EC Near LansingGreenfield——1.4 yrs58.9
EC Near LansingGreenfield——1.4 yrs58.8
EC Coal Allamakee CountyGreenfield——1.4 yrs58.0
EC Coal Allamakee CountyGreenfield——1.4 yrs57.6
UNKNOWN130575Substation-Adjacent161 kV100 MW2.8 yrs57.6
EC Near LansingGreenfield——1.4 yrs56.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Lansing, Allamakee. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.