BRAUN CORP., THE (ELEVATOR AND MOVING STAIRWAY MANUFACTURING)
ManufacturingPulaski County, Indiana
BRAUN CORP., THE (ELEVATOR AND MOVING STAIRWAY MANUFACTURING) is a manufacturing datacenter candidate site in Pulaski County, Indiana. It screens at 51.8/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
Site location
Get alerts
Track BRAUN CORP., THE (ELEVATOR AND MOVING STAIRWAY MANUFACTURING)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Pulaski County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Coal Pulaski County | Greenfield | — | — | 3.0 yrs | 58.1 |
| EC Coal Pulaski County | Greenfield | — | — | 3.0 yrs | 57.8 |
| UNKNOWN122641 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 55.6 |
| FRANCESVILLE DRAIN TILE CORP. (ALL OTHER PLASTICS PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.9 |
| VULCAN MATERIALS CO. (CUT STONE AND STONE PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.9 |
| METAL FAB ENGINEERING (IRON AND STEEL MILLS) | Manufacturing | — | — | 3.5 yrs | 52.5 |
| BNK, INC. (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 52.5 |
| KRYSTIL KLEAR FILTRATION (ALL OTHER INDUSTRIAL MACHINERY MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.2 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for BRAUN CORP., THE (ELEVATOR AND MOVING STAIRWAY MANUFACTURING), Pulaski County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.