MIDEWIN NTP

Federal Excess

Will, Illinois · PJM

DC Readiness
42.1
Fair / 100

MIDEWIN NTP is a federal excess datacenter candidate site in Will, Illinois, interconnecting through PJM. It screens at 42.1/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth265

Connectivity

Nearest IXPNETRIX - ALSIP
IXP distance29.8 mi
Fiber providers5
Max download80 Mbps

Site characteristics

Acreage10 ac
Former useOffice Building Locations

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterDatacenter (386)
DC distance26.5 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.86¢/kWh
Industrial electricity5.29¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$10,259

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
34
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
31
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Will, ranked by DC Readiness.

Sites near MIDEWIN NTP
SiteTypeVoltageCapacityQueue waitScore
JOLIET 29Substation-Adjacent345 kV600 MW4.6 yrs76.0
DUMONTSubstation-Adjacent765 kV1,000 MW4.6 yrs75.0
TAP138173Substation-Adjacent345 kV600 MW4.6 yrs74.8
UNKNOWN122243Substation-Adjacent345 kV600 MW4.6 yrs74.5
UNKNOWN124429Substation-Adjacent345 kV600 MW4.6 yrs74.4
Joliet 29Brownfield1,320 MW73.7
UNIVERSITY PARK NORTHSubstation-Adjacent345 kV600 MW4.6 yrs73.6
ELWOODSubstation-Adjacent345 kV600 MW4.6 yrs72.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MIDEWIN NTP, Will. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.