Camp Butler National Cemetery

Federal Excess

Sangamon County, Illinois · PJM

DC Readiness
40.3
Fair / 100

Camp Butler National Cemetery is a federal excess datacenter candidate site in Sangamon County, Illinois, interconnecting through PJM. It screens at 40.3/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth265

Connectivity

Nearest IXPSFN IL-Peoria
IXP distance62.7 mi

Site characteristics

Acreage10 ac
Former useParks and Historic Sites

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterSFN IL-Peoria
DC distance62.7 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.59¢/kWh
Industrial electricity7.10¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$7,261

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
34
Fiber connectivity12%
52
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
31
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Sangamon County, ranked by DC Readiness.

Sites near Camp Butler National Cemetery
SiteTypeVoltageCapacityQueue waitScore
AUSTINSubstation-Adjacent345 kV600 MW4.6 yrs69.6
PAWNEESubstation-Adjacent345 kV600 MW4.6 yrs69.2
LakesideBrownfield75 MW66.3
TAP139416Substation-Adjacent138 kV100 MW4.6 yrs65.9
Greenfield (MEREDOSIA - AUSTIN)Greenfield345 kV600 MW4.6 yrs65.7
TAP139413Substation-Adjacent138 kV100 MW4.6 yrs65.5
UNKNOWN122095Substation-Adjacent138 kV100 MW4.6 yrs65.3
UNKNOWN122769Substation-Adjacent138 kV100 MW4.6 yrs64.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Camp Butler National Cemetery, Sangamon County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.