DC Readiness
53.6
Fair / 100

At a glance

EC LaSalle Coal Area is a greenfield datacenter candidate site in LaSalle, Illinois, scoring 53.6/100 DC Readiness — 26th of 87 scored sites in the county. It sits in the PJM grid region and the COMMONWEALTH EDISON CO service territory, where interconnection has averaged 4.8 years from request to operation.

Power & interconnection

LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.10¢/kWh
UtilityCOMMONWEALTH EDISON COinvestor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookConstrained
≈ 6.1 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth393
Avg queue wait4.8 yrs
Recent queue wait6.1 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPRochelle Technology Center
IXP distance34.8 mi
Fiber providers16
Fiber coverage54.5%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance83.5 mi

Site characteristics

Site typeGreenfield
Land contactLaSalle County Assessor
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops
Former usenear retired oil plant (10km)

Risk & environment

Environmental constraintLow (25/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatPresent
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index112.1 (avg 100)

Location context

Nearest datacenterRochelle Technology Center
DC distance34.8 mi
Nearest rail3.1 mi
Nearest gas pipeline0.1 mi
Nearest fiber route43.5 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.77¢/kWh
Industrial electricity5.00¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$10,136

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC LaSalle Coal Area

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC LaSalle Coal Area compare with other sites in LaSalle?

EC LaSalle Coal Area ranks 26th of 87 scored candidate sites in LaSalle. Its 53.6/100 is roughly in line with the county average of 51.8. It is roughly in line with the Illinois average of 54.3 and roughly in line with the national average of 53.2.

Against the Illinois average, its strongest sub-score is water (89 vs 87) and its weakest is fiber connectivity (42 vs 71). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC LaSalle Coal Area to power, fiber and other datacenters?

The nearest located transmission bottleneck is 12 DRESDEN 45TR81 CT H 345 KV (PJM), 45 miles away. For connectivity, the nearest internet exchange facility is Rochelle Technology Center at 34.8 miles. 16 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Rochelle Technology Center, 34.8 miles away.

What are the flood, water and hazard risks at EC LaSalle Coal Area?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). WRI rates baseline water stress at 0.60 on a 0–5 scale. No mapped wetlands are recorded on the parcel. The parcel overlaps designated critical habitat (Indiana bat (Final)). At the county level, FEMA's National Risk Index rates LaSalle "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
47
Fiber connectivity12%
42
Energy cost10%
87
Water risk7%
89
Natural hazard6%
45
Buildability7%
65
Labor market4%
50
DC cluster4%
50
Land / acreage3%
55
Construction cost3%
57
Gas pipeline2%
100
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in LaSalle, ranked by DC Readiness.

Sites near EC LaSalle Coal Area
SiteTypeVoltageCapacityQueue waitScore
LA SALLESubstation-Adjacent345 kV600 MW4.8 yrs62.2
EC Near OglesbyGreenfield——4.8 yrs57.8
EC Lasalle Coal AreaGreenfield——4.8 yrs57.7
City of Peru Plank Road Generating StationBrownfield—8 MW4.8 yrs57.5
OZ LaSalleGreenfield——4.8 yrs57.3
UNKNOWN122007Substation-Adjacent138 kV100 MW4.8 yrs57.1
EC FFE LaSalle CountyGreenfield——4.8 yrs56.9
UNKNOWN133890Substation-Adjacent138 kV100 MW4.8 yrs56.3

EC LaSalle Coal Area: common questions

What is the DC Readiness score of EC LaSalle Coal Area?

EC LaSalle Coal Area scores 53.6/100 on the GridCensus DC Readiness scale, rated fair. It ranks 26th of 87 scored sites in LaSalle. The LaSalle average is 51.8 and the Illinois average is 54.3.

Which electric utility serves EC LaSalle Coal Area?

COMMONWEALTH EDISON CO (investor owned) holds the retail service territory that contains the site; its holding company is EXELON CORP.

What grid region is EC LaSalle Coal Area in?

EC LaSalle Coal Area is in the PJM region. Projects interconnecting there have averaged a 4.8-year wait from queue request to operation.

Is EC LaSalle Coal Area in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

Who owns EC LaSalle Coal Area?

Parcel records list the owner as AMEREN ILLINOIS COMPANY (private land).

How far is EC LaSalle Coal Area from an internet exchange?

The nearest internet exchange facility is Rochelle Technology Center, about 34.8 miles away; 16 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC LaSalle Coal Area, LaSalle, IL”, https://gridcensus.com/datacenter-sites/illinois/lasalle/ec-lasalle-coal-area-fb1677eb (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC LaSalle Coal Area, LaSalle is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.