EC Lasalle Coal Area

Greenfield

LaSalle, Illinois · MISO

DC Readiness
51.2
Fair / 100

At a glance

EC Lasalle Coal Area is a greenfield datacenter candidate site in LaSalle, Illinois, scoring 51.2/100 DC Readiness — 28th of 87 scored sites in the county. It sits in the MISO grid region and the CORN BELT ENERGY CORPORATION service territory, where interconnection has averaged 4.8 years from request to operation.

Power & interconnection

LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.10¢/kWh
UtilityCORN BELT ENERGY CORPORATIONcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 6.1 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionMISO
Queue depth277
Avg queue wait4.8 yrs
Recent queue wait6.1 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPRochelle Technology Center
IXP distance42.6 mi
Fiber providers16
Fiber coverage54.5%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance80.7 mi

Site characteristics

Site typeGreenfield
Land contactLasalle County Assessor
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands
Former usenear retired oil plant (10km)

Risk & environment

Environmental constraintHigh (65/100)
Flood zoneZone AE (SFHA)
Water stress (WRI)0.60
Wetlands (NWI)Present
Critical habitatPresent
Superfund nearbyClear
Hazard sub-score20/100
Construction cost index112.1 (avg 100)

Location context

Nearest datacenterMeta DC
DC distance41.5 mi
Nearest rail1.2 mi
Nearest gas pipeline3.9 mi
Nearest fiber route42.3 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.77¢/kWh
Industrial electricity5.00¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$10,136

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Lasalle Coal Area

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Lasalle Coal Area compare with other sites in LaSalle?

EC Lasalle Coal Area ranks 28th of 87 scored candidate sites in LaSalle. Its 51.2/100 is roughly in line with the county average of 51.8. It is roughly in line with the Illinois average of 54.3 and roughly in line with the national average of 53.2.

Against the Illinois average, its strongest sub-score is water (89 vs 87) and its weakest is natural hazard (20 vs 63). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Lasalle Coal Area to power, fiber and other datacenters?

The nearest located transmission bottleneck is 12 DRESDEN 45TR81 CT H 345 KV (PJM), 38 miles away. For connectivity, the nearest internet exchange facility is Rochelle Technology Center at 42.6 miles. 16 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Meta DC, 41.5 miles away.

What are the flood, water and hazard risks at EC Lasalle Coal Area?

The site is in FEMA flood zone AE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding. WRI rates baseline water stress at 0.60 on a 0–5 scale. Mapped wetlands (National Wetlands Inventory) are present on the parcel. The parcel overlaps designated critical habitat (Indiana bat (Final)). At the county level, FEMA's National Risk Index rates LaSalle "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
47
Fiber connectivity12%
65
Energy cost10%
93
Water risk7%
89
Natural hazard6%
20
Buildability7%
15
Labor market4%
50
DC cluster4%
50
Land / acreage3%
40
Construction cost3%
57
Gas pipeline2%
87
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in LaSalle, ranked by DC Readiness.

Sites near EC Lasalle Coal Area
SiteTypeVoltageCapacityQueue waitScore
LA SALLESubstation-Adjacent345 kV600 MW4.8 yrs62.2
EC Near OglesbyGreenfield——4.8 yrs57.8
EC Lasalle Coal AreaGreenfield——4.8 yrs57.7
City of Peru Plank Road Generating StationBrownfield—8 MW4.8 yrs57.5
OZ LaSalleGreenfield——4.8 yrs57.3
UNKNOWN122007Substation-Adjacent138 kV100 MW4.8 yrs57.1
EC FFE LaSalle CountyGreenfield——4.8 yrs56.9
UNKNOWN133890Substation-Adjacent138 kV100 MW4.8 yrs56.3

EC Lasalle Coal Area: common questions

What is the DC Readiness score of EC Lasalle Coal Area?

EC Lasalle Coal Area scores 51.2/100 on the GridCensus DC Readiness scale, rated fair. It ranks 28th of 87 scored sites in LaSalle. The LaSalle average is 51.8 and the Illinois average is 54.3.

Which electric utility serves EC Lasalle Coal Area?

CORN BELT ENERGY CORPORATION (cooperative) holds the retail service territory that contains the site.

What grid region is EC Lasalle Coal Area in?

EC Lasalle Coal Area is in the MISO region. Projects interconnecting there have averaged a 4.8-year wait from queue request to operation.

Is EC Lasalle Coal Area in a flood zone?

The site is in FEMA flood zone AE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding.

Who owns EC Lasalle Coal Area?

Parcel records list the owner as COMMONWEALTH EDISON CO (private land).

How far is EC Lasalle Coal Area from an internet exchange?

The nearest internet exchange facility is Rochelle Technology Center, about 42.6 miles away; 16 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Lasalle Coal Area, LaSalle, IL”, https://gridcensus.com/datacenter-sites/illinois/lasalle/ec-lasalle-coal-area-37b11d54 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Lasalle Coal Area, LaSalle is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.