RATHDRUM PRAIRIE PROJECT

Federal Excess

Kootenai County, Idaho · WECC

DC Readiness
53.5
Fair / 100

RATHDRUM PRAIRIE PROJECT is a federal excess datacenter candidate site in Kootenai County, Idaho, interconnecting through WECC. It screens at 53.5/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPNeutron - Coeur d'Alene
IXP distance8.5 mi
Fiber providers11
Fiber coverage67.4%

Site characteristics

Acreage7 ac
Former useReclamation and Irrigation

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterNeutron - Coeur d'Alene
DC distance8.5 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.64¢/kWh
Industrial electricity8.37¢/kWh
Cooling degree days500
Heating degree days6,400
Land price / acre$11,050

Incentive detail: Personal property tax exemption on computer equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
42
Fiber connectivity12%
87
Energy cost10%
50
Water risk8%
44
Natural hazard8%
85
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
36
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Kootenai County, ranked by DC Readiness.

Sites near RATHDRUM PRAIRIE PROJECT
SiteTypeVoltageCapacityQueue waitScore
OZ KootenaiGreenfield2.0 yrs64.3
RATHDRUMSubstation-Adjacent230 kV300 MW6.9 yrs63.1
LANCASTERSubstation-Adjacent230 kV300 MW6.9 yrs63.1
TAP205408Substation-Adjacent138 kV100 MW6.9 yrs61.0
TAP207665Substation-Adjacent115 kV100 MW6.9 yrs59.6
UNKNOWN206765Substation-Adjacent138 kV100 MW6.9 yrs59.6
DOWERSubstation-Adjacent115 kV100 MW6.9 yrs59.3
UNKNOWN206221Substation-Adjacent69 kV50 MW6.9 yrs59.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for RATHDRUM PRAIRIE PROJECT, Kootenai County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.