Bannock County, Idaho · WECC

DC Readiness
53.3
Fair / 100

TAP204786 is a substation-adjacent datacenter candidate site in Bannock County, Idaho, interconnecting through WECC. It screens at 53.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP204786
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPLowest Host/Empire Technology
IXP distance127.4 mi
Fiber providers7
Fiber coverage82.2%

Site characteristics

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterFamily History Center
DC distance36.5 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity9.71¢/kWh
Industrial electricity8.22¢/kWh
Cooling degree days500
Heating degree days6,400
Land price / acre$2,753

Incentive detail: Personal property tax exemption on computer equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
42
Fiber connectivity12%
42
Energy cost10%
50
Water risk8%
44
Natural hazard8%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Bannock County, ranked by DC Readiness.

Sites near TAP204786
SiteTypeVoltageCapacityQueue waitScore
POPULUSSubstation-Adjacent345 kV600 MW6.9 yrs59.2
UNKNOWN202624Substation-Adjacent138 kV100 MW6.9 yrs53.3
UNKNOWN205004Substation-Adjacent115 kV100 MW6.9 yrs52.9
FREMONTSubstation-Adjacent161 kV100 MW6.9 yrs52.9
TAP205001Substation-Adjacent115 kV100 MW6.9 yrs52.9
UNKNOWN207277Substation-Adjacent115 kV100 MW6.9 yrs52.9
TAP205003Substation-Adjacent115 kV100 MW6.9 yrs52.9
ALAMEDASubstation-Adjacent138 kV100 MW6.9 yrs52.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.