Skip to content
Gridcensus

EC Coal Monroe County

Greenfield

Monroe County, Georgia · SERC

DC Readiness
60.2
Good / 100

EC Coal Monroe County is a greenfield datacenter candidate site in Monroe County, Georgia, interconnecting through SERC. It screens at 60.2/100 DC Readiness and a 5.8 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.13¢/kWh
UtilityGEORGIA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWPSC large-load rules (≥100 MW): direct-pay contracts · 15 yr

Speed to power

Interconnection outlookConstrained
≈ 5.2 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionSERC
Queue depth1
Avg queue wait5.8 yrs
Recent queue wait5.2 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPQTS Atlanta-Fayetteville (ATL2)
IXP distance37.9 mi
Fiber providers8
Fiber coverage90.9%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance229.2 mi

Site characteristics

Site typeGreenfield
Parcel ownerGEORGIA POWER CO
Land contactMonroe County County Assessor
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest
Former usecoal adjacent

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)1.00
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score60/100
Construction cost index73.1 (avg 100)

Location context

Nearest datacenterMeta DC
DC distance35.3 mi
Nearest rail6.0 mi
Nearest gas pipeline2.7 mi
Nearest fiber route9.3 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.53¢/kWh
Industrial electricity8.12¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$4,275

Regulatory climate

Favorablestate posture · as of 2026-08

Active incentives; Georgia Power courts large load with bring-your-own clean-energy options.

DC tax incentiveYes
Large-load threshold≥ 100 MW

Georgia Power billing/contract rules apply to very large loads.

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Monroe County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
70
Fiber connectivity12%
71
Energy cost10%
89
Water risk7%
79
Natural hazard6%
60
Buildability7%
45
Labor market4%
50
DC cluster4%
40
Land / acreage3%
47
Construction cost3%
89
Gas pipeline2%
91
Tax incentive1%
100
Climate / cooling1%
15

Nearby comparable sites

Other scored datacenter candidate sites in Monroe County, ranked by DC Readiness.

Sites near EC Coal Monroe County
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN115783Substation-Adjacent500 kV1,000 MW1.0 yrs72.0
EC Near Rumble Road Energy CenterGreenfield5.8 yrs63.7
UNKNOWN115232Substation-Adjacent115 kV100 MW1.0 yrs63.1
EC Coal Monroe CountyGreenfield5.8 yrs62.4
EC Near Rumble Road Energy CenterGreenfield5.8 yrs61.8
UNKNOWN115781Substation-Adjacent115 kV100 MW1.0 yrs61.1
UNKNOWN115782Substation-Adjacent115 kV100 MW1.0 yrs61.1
UNKNOWN115231Substation-Adjacent115 kV100 MW1.0 yrs61.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Coal Monroe County, Monroe County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.