EC Near McManus is a greenfield datacenter candidate site in Glynn County, Georgia, interconnecting through SERC. It screens at 55.3/100 DC Readiness and a 5.8 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.12¢/kWh
UtilityGEORGIA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWPSC large-load rules (≥100 MW): direct-pay contracts · 15 yr

Speed to power

Interconnection outlookConstrained
≈ 5.2 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionSERC
Queue depth1
Avg queue wait5.8 yrs
Recent queue wait5.2 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPCologix JAX1
IXP distance55.2 mi
Fiber providers7
Fiber coverage94.7%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance169.0 mi

Site characteristics

Site typeGreenfield
Parcel ownerGEORGIA POWER CO
Land contactGlynn County Assessor
Land owner typeprivate
Buildability0.0/100
Land cover (NLCD)Emergent Herbaceous Wetlands
Former usenear retired oil plant (10km)

Risk & environment

Environmental constraintHigh (70/100)
Flood zoneZone AE (SFHA)
Water stress (WRI)1.00
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyPresent
Superfund siteBMW OF NORTH AMERICA LLC
Hazard sub-score25/100
Construction cost index100.2 (avg 100)

Location context

Nearest datacenterCologix Jacksonville JAX1
DC distance55.2 mi
Nearest rail0.1 mi
Nearest gas pipeline2.1 mi
Nearest fiber route169.0 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.18¢/kWh
Industrial electricity6.23¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$32,706

Regulatory climate

Favorablestate posture · as of 2026-08

Active incentives; Georgia Power courts large load with bring-your-own clean-energy options.

DC tax incentiveYes
Large-load threshold≥ 100 MW

Georgia Power billing/contract rules apply to very large loads.

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near McManus

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
70
Fiber connectivity12%
75
Energy cost10%
89
Water risk7%
81
Natural hazard6%
25
Buildability7%
0
Labor market4%
50
DC cluster4%
45
Land / acreage3%
47
Construction cost3%
67
Gas pipeline2%
93
Tax incentive1%
100
Climate / cooling1%
15

Nearby comparable sites

Other scored datacenter candidate sites in Glynn County, ranked by DC Readiness.

Sites near EC Near McManus
SiteTypeVoltageCapacityQueue waitScore
THALMANNSubstation-Adjacent500 kV1,000 MW1.0 yrs68.7
UNKNOWN111819Substation-Adjacent230 kV300 MW1.0 yrs65.4
UNKNOWN111817Substation-Adjacent230 kV300 MW1.0 yrs64.6
TAP142093Substation-Adjacent230 kV300 MW1.0 yrs64.4
OZ GlynnGreenfield——5.8 yrs61.3
UNKNOWN111824Substation-Adjacent115 kV100 MW1.0 yrs61.1
EC Near McManusGreenfield——5.8 yrs60.3
UNKNOWN116994Substation-Adjacent115 kV100 MW1.0 yrs60.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near McManus, Glynn County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.