EC Near Jack McDonough

Greenfield

Cobb County, Georgia · SERC

DC Readiness
67.3
Good / 100

EC Near Jack McDonough is a greenfield datacenter candidate site in Cobb County, Georgia, interconnecting through SERC. It screens at 67.3/100 DC Readiness and a 5.8 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.11¢/kWh
UtilityGEORGIA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWPSC large-load rules (≥100 MW): direct-pay contracts · 15 yr

Speed to power

Interconnection outlookConstrained
≈ 5.2 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionSERC
Queue depth1
Avg queue wait5.8 yrs
Recent queue wait5.2 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDigital Realty ATL (101 Aquila)
IXP distance1.9 mi
Fiber providers13
Fiber coverage60.0%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance264.5 mi

Site characteristics

Site typeGreenfield
Parcel ownerGEORGIA POWER CO
Land contactCobb County Assessor
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity
Former usenear retired coal plant (10km)

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)1.00
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteDEVRO TEEPAK INC
Hazard sub-score50/100
Construction cost index100.2 (avg 100)

Location context

Nearest datacenterDigital Realty Atlanta ATL11
DC distance1.9 mi
Nearest rail0.2 mi
Nearest gas pipeline6.3 mi
Nearest fiber route23.6 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.31¢/kWh
Industrial electricity7.68¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$21,524

Regulatory climate

Favorablestate posture · as of 2026-08

Active incentives; Georgia Power courts large load with bring-your-own clean-energy options.

DC tax incentiveYes
Large-load threshold≥ 100 MW

Georgia Power billing/contract rules apply to very large loads.

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Jack McDonough

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
70
Fiber connectivity12%
91
Energy cost10%
89
Water risk7%
80
Natural hazard6%
50
Buildability7%
92
Labor market4%
50
DC cluster4%
100
Land / acreage3%
62
Construction cost3%
67
Gas pipeline2%
80
Tax incentive1%
100
Climate / cooling1%
15

Nearby comparable sites

Other scored datacenter candidate sites in Cobb County, ranked by DC Readiness.

Sites near EC Near Jack McDonough
SiteTypeVoltageCapacityQueue waitScore
BIG SHANTYSubstation-Adjacent500 kV1,000 MW1.0 yrs73.6
BULL SLUICESubstation-Adjacent500 kV1,000 MW1.0 yrs72.6
UNKNOWN116281Substation-Adjacent230 kV300 MW1.0 yrs69.7
UNKNOWN116279Substation-Adjacent230 kV300 MW1.0 yrs69.5
UNKNOWN111519Substation-Adjacent230 kV300 MW1.0 yrs69.5
UNKNOWN111523Substation-Adjacent230 kV300 MW1.0 yrs69.2
UNKNOWN111540Substation-Adjacent230 kV300 MW1.0 yrs69.2
UNKNOWN115907Substation-Adjacent230 kV300 MW1.0 yrs68.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Jack McDonough, Cobb County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.