G2 Energy Marion LLC

Brownfield

Marion County, Florida · SERC

DC Readiness
54.1
Fair / 100

G2 Energy Marion LLC is a brownfield datacenter candidate site in Marion County, Florida, interconnecting through SERC. It screens at 54.1/100 DC Readiness with a catalogued 2 MW of candidate capacity and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Available capacity2 MW
Utility commercial rate0.13¢/kWh
UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPSmart City Telecom Maitland Colo
IXP distance51.9 mi
Fiber providers17
Fiber coverage49.3%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance306.2 mi

Site characteristics

Site typeBrownfield
Parcel ownerG2 Energy LLC
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity
Former usegas
Existing capacity2 MW
Retirement date2021-11-01

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteG2 ENERGY MARION LLC
Hazard sub-score35/100
Construction cost index72.9 (avg 100)

Location context

Nearest datacenterUF Research Computing Center
DC distance40.7 mi
Nearest rail0.7 mi
Nearest gas pipeline6.1 mi
Nearest fiber route42.6 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.21¢/kWh
Industrial electricity9.23¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$12,964

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track G2 Energy Marion LLC

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
23
Speed to power20%
54
Fiber connectivity12%
40
Energy cost10%
89
Water risk7%
82
Natural hazard6%
35
Buildability7%
95
Labor market4%
50
DC cluster4%
40
Land / acreage3%
57
Construction cost3%
89
Gas pipeline2%
80
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Marion County, ranked by DC Readiness.

Sites near G2 Energy Marion LLC
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121765Substation-Adjacent230 kV300 MW1.0 yrs63.4
SEMINOLE ELECTRIC COOPERATIVESubstation-Adjacent230 kV300 MW1.0 yrs62.6
UNKNOWN120464Substation-Adjacent230 kV300 MW1.0 yrs62.5
TAP151445Substation-Adjacent230 kV300 MW1.0 yrs62.5
UNKNOWN108236Substation-Adjacent230 kV300 MW1.0 yrs62.4
OZ MarionGreenfield——3.6 yrs61.9
OZ MarionGreenfield——3.6 yrs61.8
OZ MarionGreenfield——3.6 yrs61.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for G2 Energy Marion LLC, Marion County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.