SEMINOLE ELECTRIC COOPERATIVE is a substation-adjacent datacenter candidate site in Marion County, Florida, interconnecting through SERC. It screens at 61.9/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSEMINOLE ELECTRIC COOPERATIVE
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPSmart City Telecom Maitland Colo
IXP distance57.9 mi
Fiber providers17
Fiber coverage49.3%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterUF Research Computing Center
DC distance33.4 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.21¢/kWh
Industrial electricity9.23¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$12,964

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track SEMINOLE ELECTRIC COOPERATIVE

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
75
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Marion County, ranked by DC Readiness.

Sites near SEMINOLE ELECTRIC COOPERATIVE
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121765Substation-Adjacent230 kV300 MW1.0 yrs62.8
UNKNOWN120464Substation-Adjacent230 kV300 MW1.0 yrs61.8
TAP151445Substation-Adjacent230 kV300 MW1.0 yrs61.8
UNKNOWN108236Substation-Adjacent230 kV300 MW1.0 yrs61.7
OZ MarionGreenfield——3.6 yrs61.0
OZ MarionGreenfield——3.6 yrs60.9
ROSS PRAIRIESubstation-Adjacent230 kV300 MW1.0 yrs60.9
EC Near G2 Energy Marion LLCGreenfield——3.6 yrs60.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for SEMINOLE ELECTRIC COOPERATIVE, Marion County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.