PROGRESS ENERGY CLERMONT

Substation-Adjacent

Lake County, Florida · SERC

DC Readiness
56.4
Good / 100

At a glance

PROGRESS ENERGY CLERMONT is a substation-adjacent datacenter candidate site in Lake County, Florida, scoring 56.4/100 DC Readiness — 24th of 75 scored sites in the county. Its nearest substation is PROGRESS ENERGY CLERMONT (0 mi, 69 kV). It sits in the SERC grid region and the DUKE ENERGY FLORIDA, LLC service territory, where interconnection has averaged 3.7 years from request to operation. GridCensus catalogs 50 MW of candidate capacity here.

Power & interconnection

Nearest substationPROGRESS ENERGY CLERMONT
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.6 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait4.6 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPCoreSite - Orlando (OR1)
IXP distance21.5 mi
Fiber providers11
Fiber coverage50.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterE-Foam
DC distance11.1 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.28¢/kWh
Industrial electricity9.27¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$11,976

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track PROGRESS ENERGY CLERMONT

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does PROGRESS ENERGY CLERMONT compare with other sites in Lake County?

PROGRESS ENERGY CLERMONT ranks 24th of 75 scored candidate sites in Lake County. Its 56.4/100 is roughly in line with the county average of 55.6. It is roughly in line with the Florida average of 56.0 and roughly in line with the national average of 53.2.

Against the Florida average, its strongest sub-score is power availability (46 vs 41) and its weakest is fiber connectivity (65 vs 73). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is PROGRESS ENERGY CLERMONT to power, fiber and other datacenters?

The nearest mapped substation, PROGRESS ENERGY CLERMONT, is about 0 miles away and operates at 69 kV. For connectivity, the nearest internet exchange facility is CoreSite - Orlando (OR1) at 21.5 miles. 11 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is E-Foam, 11.1 miles away.

What are the flood, water and hazard risks at PROGRESS ENERGY CLERMONT?

At the county level, FEMA's National Risk Index rates Lake County "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
65
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Lake County, ranked by DC Readiness.

Sites near PROGRESS ENERGY CLERMONT
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN120219Substation-Adjacent230 kV300 MW3.7 yrs64.8
CLERMONT EASTSubstation-Adjacent230 kV300 MW3.7 yrs63.1
UNKNOWN120511Substation-Adjacent230 kV300 MW3.7 yrs63.0
CAMP LAKESubstation-Adjacent230 kV300 MW3.7 yrs62.9
TAP143144Substation-Adjacent230 kV300 MW3.7 yrs61.7
EC Near Cutrale Citrus Juices USA IGreenfield——3.7 yrs59.9
EC Near Cutrale Citrus Juices USA IGreenfield——3.7 yrs59.4
EC Near Cutrale Citrus Juices USA IGreenfield——3.7 yrs59.0

PROGRESS ENERGY CLERMONT: common questions

What is the DC Readiness score of PROGRESS ENERGY CLERMONT?

PROGRESS ENERGY CLERMONT scores 56.4/100 on the GridCensus DC Readiness scale, rated good. It ranks 24th of 75 scored sites in Lake County. The Lake County average is 55.6 and the Florida average is 56.0.

What is the nearest substation to PROGRESS ENERGY CLERMONT?

The nearest mapped substation is PROGRESS ENERGY CLERMONT, about 0 miles away, at 69 kV. GridCensus catalogs 50 MW of candidate capacity for the site.

Which electric utility serves PROGRESS ENERGY CLERMONT?

DUKE ENERGY FLORIDA, LLC (investor owned) holds the retail service territory that contains the site; its holding company is DUKE ENERGY CORP.

What grid region is PROGRESS ENERGY CLERMONT in?

PROGRESS ENERGY CLERMONT is in the SERC region. Projects interconnecting there have averaged a 3.7-year wait from queue request to operation.

How far is PROGRESS ENERGY CLERMONT from an internet exchange?

The nearest internet exchange facility is CoreSite - Orlando (OR1), about 21.5 miles away; 11 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “PROGRESS ENERGY CLERMONT, Lake County, FL”, https://gridcensus.com/datacenter-sites/florida/lake-county/progress-energy-clermont-8c30b8fa (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for PROGRESS ENERGY CLERMONT, Lake County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.