Coker Fuel

Industrial

Hardee, Florida · SERC

DC Readiness
45.4
Fair / 100

At a glance

Coker Fuel is an industrial datacenter candidate site in Hardee, Florida, scoring 45.4/100 DC Readiness — 32nd of 33 scored sites in the county. It sits in the SERC grid region and the DUKE ENERGY FLORIDA, LLC service territory, where interconnection has averaged 3.7 years from request to operation.

Power & interconnection

UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.6 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait4.6 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPLawton Information Services, LLC
IXP distance29.9 mi
Fiber providers5
Fiber coverage20.9%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterLawton Information Services, LLC
DC distance29.9 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.13¢/kWh
Industrial electricity15.01¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$6,616

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Coker Fuel

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Coker Fuel compare with other sites in Hardee?

Coker Fuel ranks 32nd of 33 scored candidate sites in Hardee. Its 45.4/100 is about 17% below the county average of 54.5. It is about 19% below the Florida average of 56.0 and about 15% below the national average of 53.2.

Against the Florida average, its strongest sub-score is natural hazard (45 vs 43) and its weakest is fiber connectivity (13 vs 73). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Coker Fuel to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Lawton Information Services, LLC at 29.9 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Lawton Information Services, LLC, 29.9 miles away.

What are the flood, water and hazard risks at Coker Fuel?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates Hardee "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
65
Fiber connectivity12%
13
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Hardee, ranked by DC Readiness.

Sites near Coker Fuel
SiteTypeVoltageCapacityQueue waitScore
Brownfield SiteBrownfield—1,560 MW3.7 yrs66.0
UNKNOWN120311Substation-Adjacent230 kV300 MW3.7 yrs65.2
UNKNOWN127705Substation-Adjacent230 kV300 MW3.7 yrs64.5
UNKNOWN153224Substation-Adjacent230 kV300 MW3.7 yrs61.6
VANDOLAHSubstation-Adjacent230 kV300 MW3.7 yrs61.0
EC Near UnknownGreenfield——3.7 yrs60.4
EC Near Midulla Generating StationGreenfield——3.7 yrs60.2
EC Near UnknownGreenfield——3.7 yrs59.3

Coker Fuel: common questions

What is the DC Readiness score of Coker Fuel?

Coker Fuel scores 45.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 32nd of 33 scored sites in Hardee. The Hardee average is 54.5 and the Florida average is 56.0.

Which electric utility serves Coker Fuel?

DUKE ENERGY FLORIDA, LLC (investor owned) holds the retail service territory that contains the site; its holding company is DUKE ENERGY CORP.

What grid region is Coker Fuel in?

Coker Fuel is in the SERC region. Projects interconnecting there have averaged a 3.7-year wait from queue request to operation.

Is Coker Fuel in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

How far is Coker Fuel from an internet exchange?

The nearest internet exchange facility is Lawton Information Services, LLC, about 29.9 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Coker Fuel, Hardee, FL”, https://gridcensus.com/datacenter-sites/florida/hardee/coker-fuel-0b1c72af (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Coker Fuel, Hardee is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.