Greenfield

Dixie County, Florida · SERC

DC Readiness
59.1
Good / 100

OZ Dixie is a greenfield datacenter candidate site in Dixie County, Florida, interconnecting through SERC. It screens at 59.1/100 DC Readiness and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.14¢/kWh
UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance93.1 mi
Fiber providers2
Fiber coverage98.7%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance306.0 mi

Site characteristics

Site typeGreenfield
Land contactDixie County Assessor
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteCROSS CITY NURSING AND REHABILITATION CENTER
Hazard sub-score35/100
Construction cost index55.9 (avg 100)

Location context

Nearest datacenterUF Research Computing Center
DC distance49.3 mi
Nearest rail1.1 mi
Nearest gas pipeline17.4 mi
Nearest fiber route92.2 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.58¢/kWh
Industrial electricity8.72¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$4,694

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Dixie

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
74
Fiber connectivity12%
74
Energy cost10%
89
Water risk7%
82
Natural hazard6%
35
Buildability7%
40
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
100
Gas pipeline2%
44
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Dixie County, ranked by DC Readiness.

Sites near OZ Dixie
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN157578Substation-Adjacent69 kV50 MW1.0 yrs57.5
UNKNOWN108270Substation-Adjacent69 kV50 MW1.0 yrs57.4
TAP154675Substation-Adjacent69 kV50 MW1.0 yrs57.4
UNKNOWN156659Substation-Adjacent69 kV50 MW1.0 yrs55.5
City Maintenance YardIndustrial——1.0 yrs53.6
Driggers PropertyIndustrial——1.0 yrs53.5
Gourmet GrillwoodIndustrial——1.0 yrs53.5
Troxell/County Parcels (Proposed Healthcare Site)Industrial——1.0 yrs53.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.