TAP154675
Substation-AdjacentDixie County, Florida · SERC
TAP154675 is a substation-adjacent datacenter candidate site in Dixie County, Florida, interconnecting through SERC. It screens at 53.3/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Risk & environment
Location context
Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Dixie County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Dixie | Greenfield | — | — | 3.6 yrs | 58.1 |
| UNKNOWN157578 | Substation-Adjacent | 69 kV | 50 MW | 1.0 yrs | 53.3 |
| UNKNOWN108270 | Substation-Adjacent | 69 kV | 50 MW | 1.0 yrs | 53.3 |
| City Maintenance Yard | Industrial | — | — | 1.0 yrs | 52.9 |
| Riels/Corbin Property | Industrial | — | — | 1.0 yrs | 52.8 |
| Gaye O'Steen Industrial Property | Industrial | — | — | 1.0 yrs | 52.8 |
| Suwannee Dump Site Site 11 | Industrial | — | — | 1.0 yrs | 52.8 |
| Troxell/County Parcels (Proposed Healthcare Site) | Industrial | — | — | 1.0 yrs | 52.8 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP154675, Dixie County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.