Mine Site

Former Mine

Citrus, Florida · PJM

DC Readiness
43.5
Fair / 100

Mine Site is a former mine datacenter candidate site in Citrus, Florida, interconnecting through PJM. It screens at 43.5/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth9

Connectivity

Nearest IXPFlexential - Tampa/North (TPA03)
IXP distance65.0 mi

Site characteristics

Site typeFormer Mine
Former useMining: Coal; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterUF Research Computing Center
DC distance50.1 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.18¢/kWh
Industrial electricity8.09¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$13,801

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
48
Fiber connectivity12%
52
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Citrus, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
CRYSTAL RIVERSubstation-Adjacent500 kV1,000 MW3.6 yrs68.3
Greenfield (CRYSTAL RIVER - CENTRAL FLORID)Greenfield500 kV1,000 MW3.6 yrs67.6
TAP155704Substation-Adjacent230 kV300 MW3.6 yrs67.2
CRYSTAL RIVER EASTSubstation-Adjacent230 kV300 MW3.6 yrs66.9
BEVERLY HILLSSubstation-Adjacent115 kV100 MW3.6 yrs64.6
UNKNOWN108227Substation-Adjacent115 kV100 MW3.6 yrs64.5
HOMOSASSASubstation-Adjacent115 kV100 MW3.6 yrs64.3
TAP151112Substation-Adjacent115 kV100 MW3.6 yrs64.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Citrus. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.