EC Near Waterside Power, LLC

Greenfield

Western Connecticut County, Connecticut · ISO-NE

DC Readiness
55.0
Good / 100

EC Near Waterside Power, LLC is a greenfield datacenter candidate site in Western Connecticut County, Connecticut, interconnecting through ISO-NE. It screens at 55.0/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneISONE_CT
Wholesale LMP$66.59/MWh

Speed to power

ISO / RTO regionISO-NE
Queue depth18
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate25%
Withdrawal rate75%

Connectivity

Nearest IXPLumen Stamford
IXP distance4.9 mi
Fiber providers6
Fiber coverage82.4%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance254.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerLONG ISLAND POWER AUTHORITY
Land owner typeprivate
Buildability50.0/100
Former usenear retired oil plant (10km)

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index100.0 (avg 100)

Location context

Nearest datacenterLumen Stamford
DC distance4.9 mi
Nearest rail2.8 mi
Nearest gas pipeline3.8 mi
Nearest fiber route73.0 mi
County hazard (FEMA NRI)Relatively Low (20)
DC tax incentiveYes (sales_tax_exemption)
Cooling degree days700
Heating degree days5,800
Land price / acre$14,669

Incentive detail: Sales tax exemption on computer & data processing equipment.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
54
Fiber connectivity12%
92
Energy cost10%
0
Water risk8%
88
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
31
Construction cost3%
67
Gas pipeline2%
88
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Western Connecticut County, ranked by DC Readiness.

Sites near EC Near Waterside Power, LLC
SiteTypeVoltageCapacityQueue waitScore
PLUMTREESubstation-Adjacent345 kV600 MW3.5 yrs67.0
NORWALKSubstation-Adjacent115 kV100 MW3.5 yrs63.9
STONY HILLSubstation-Adjacent115 kV100 MW3.5 yrs63.8
UNKNOWN133266Substation-Adjacent115 kV100 MW3.5 yrs62.9
TAP140853Substation-Adjacent115 kV100 MW3.5 yrs62.5
FLAX HILLSubstation-Adjacent115 kV100 MW3.5 yrs62.2
EC Near Norwalk Hospital PlantGreenfield3.5 yrs62.2
TAP136415Substation-Adjacent115 kV100 MW3.5 yrs61.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Waterside Power, LLC, Western Connecticut County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.