Greenfield (COLUMBIA - CHRISTIANA)

Greenfield

Jefferson County, Connecticut · ISO-NE

DC Readiness
59.1
Good / 100

Greenfield (COLUMBIA - CHRISTIANA) is a greenfield datacenter candidate site in Jefferson County, Connecticut, interconnecting through ISO-NE. It screens at 59.1/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCOLUMBIA
Substation voltage345 kV
Available capacity600 MW

Speed to power

Interconnection outlookModerate
≈ 3.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionISO-NE
Queue depth8
Avg queue wait3.9 yrs

Connectivity

Nearest IXPEdgeConneX Madison (EDCMAD01)
IXP distance18.7 mi
Fiber providers10
Fiber coverage31.9%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterEdgeConneX Madison (EDCMAD01)
DC distance18.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.10¢/kWh
Industrial electricity8.91¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$7,967

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (COLUMBIA - CHRISTIANA)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power20%
38
Fiber connectivity12%
67
Energy cost10%
50
Water risk7%
94
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Jefferson County, ranked by DC Readiness.

Sites near Greenfield (COLUMBIA - CHRISTIANA)
SiteTypeVoltageCapacityQueue waitScore
CHRISTIANASubstation-Adjacent345 kV600 MW2.8 yrs64.6
OZ JeffersonGreenfield——1.4 yrs60.8
OZ JeffersonGreenfield——1.4 yrs60.6
LAKEHEADSubstation-Adjacent138 kV100 MW2.8 yrs59.3
LONDONSubstation-Adjacent138 kV100 MW2.8 yrs58.9
TAP161904Substation-Adjacent138 kV100 MW2.8 yrs58.8
CAMBRIDGESubstation-Adjacent138 kV100 MW2.8 yrs58.6
FORT ATKINSONSubstation-Adjacent138 kV100 MW2.8 yrs58.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.