Del Norte potato growers COOP

Industrial

Rio Grande County, Colorado · WECC

DC Readiness
48.1
Fair / 100

Del Norte potato growers COOP is an industrial datacenter candidate site in Rio Grande County, Colorado, interconnecting through WECC. It screens at 48.1/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

UtilityPUBLIC SERVICE CO OF COLORADOinvestor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPT5@Colorado Springs
IXP distance114.0 mi
Fiber providers4
Fiber coverage77.8%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterT5@Colorado Springs
DC distance114.0 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.75¢/kWh
Industrial electricity12.25¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$5,672

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Del Norte potato growers COOP

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
43
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Rio Grande County, ranked by DC Readiness.

Sites near Del Norte potato growers COOP
SiteTypeVoltageCapacityQueue waitScore
OZ Rio GrandeGreenfield——1.7 yrs56.2
UNKNOWN203913Substation-Adjacent115 kV100 MW6.9 yrs54.1
RAMONSubstation-Adjacent115 kV100 MW6.9 yrs54.0
TAP204041Substation-Adjacent69 kV50 MW6.9 yrs52.2
SOUTH FORKSubstation-Adjacent69 kV50 MW6.9 yrs52.1
DEL NORTESubstation-Adjacent69 kV50 MW6.9 yrs52.0
UNKNOWN204036Substation-Adjacent69 kV50 MW6.9 yrs51.9
Montez ParkIndustrial——6.9 yrs48.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Del Norte potato growers COOP, Rio Grande County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.