Rio Grande County, Colorado · WECC

DC Readiness
54.0
Fair / 100

RAMON is a substation-adjacent datacenter candidate site in Rio Grande County, Colorado, interconnecting through WECC. It screens at 54.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationRAMON
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilitySAN LUIS VALLEY R E C, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXP2210Cortez LLC
IXP distance112.3 mi
Fiber providers4
Fiber coverage77.8%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterT5@Colorado Springs
DC distance121.7 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.75¢/kWh
Industrial electricity12.25¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$5,672

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track RAMON

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
43
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Rio Grande County, ranked by DC Readiness.

Sites near RAMON
SiteTypeVoltageCapacityQueue waitScore
OZ Rio GrandeGreenfield——1.7 yrs56.2
UNKNOWN203913Substation-Adjacent115 kV100 MW6.9 yrs54.1
TAP204041Substation-Adjacent69 kV50 MW6.9 yrs52.2
SOUTH FORKSubstation-Adjacent69 kV50 MW6.9 yrs52.1
DEL NORTESubstation-Adjacent69 kV50 MW6.9 yrs52.0
UNKNOWN204036Substation-Adjacent69 kV50 MW6.9 yrs51.9
Monte Vista Boys and Girls Club PropertyIndustrial——6.9 yrs48.2
Montez ParkIndustrial——6.9 yrs48.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for RAMON, Rio Grande County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.