Fryingpan-Arkansas

Federal Excess

Pueblo County, Colorado · SPP

DC Readiness
49.7
Fair / 100

Fryingpan-Arkansas is a federal excess datacenter candidate site in Pueblo County, Colorado, interconnecting through SPP. It screens at 49.7/100 DC Readiness and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

UtilitySAN ISABEL ELECTRIC ASSN, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth33
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPT5@Colorado Springs
IXP distance33.5 mi
Fiber providers8
Fiber coverage66.7%

Site characteristics

Acreage101 ac
Buildable load (est.)~40–101 MWland-based
Land contactPueblo County County Assessor
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterT5@Colorado Springs
DC distance33.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.62¢/kWh
Industrial electricity9.08¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$1,659

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Fryingpan-Arkansas

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
56
Fiber connectivity12%
66
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
67
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Pueblo County, ranked by DC Readiness.

Sites near Fryingpan-Arkansas
SiteTypeVoltageCapacityQueue waitScore
COMANCHESubstation-Adjacent345 kV600 MW3.5 yrs63.8
PUEBLOSubstation-Adjacent230 kV300 MW3.5 yrs59.1
EC Near Pueblo Airport Generating StationGreenfield——3.5 yrs58.8
BOONESubstation-Adjacent230 kV300 MW3.5 yrs58.8
OZ PuebloGreenfield——3.5 yrs58.6
EC Near Pueblo Airport Generating StationGreenfield——3.5 yrs58.5
EC Near Pueblo Airport Generating StationGreenfield——3.5 yrs58.1
EC Coal Pueblo CountyGreenfield——4.3 yrs58.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Fryingpan-Arkansas, Pueblo County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.