Skip to content
Gridcensus

EC Near Brush Generation Facility

Greenfield

Morgan, Colorado · WECC

DC Readiness
58.0
Good / 100

EC Near Brush Generation Facility is a greenfield datacenter candidate site in Morgan, Colorado, interconnecting through WECC. It screens at 58.0/100 DC Readiness and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.10¢/kWh
UtilityMORGAN COUNTY RURAL ELEC ASSNcooperativemoderate to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionWECC
Queue depth34
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXP365 Data Centers Aurora (CO1)
IXP distance74.3 mi
Fiber providers8
Fiber coverage74.2%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance407.4 mi

Site characteristics

Site typeGreenfield
Parcel ownerHillrose Dairy Llc
Land contactMorgan County Assessor
Parcel APN103520000014
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops
Former usenear retired gas plant (10km)

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index102.2 (avg 100)

Location context

Nearest datacenterWindbreak Cable
DC distance66.5 mi
Nearest rail0.1 mi
Nearest gas pipeline2.9 mi
Nearest fiber route80.0 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.21¢/kWh
Industrial electricity11.94¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$2,717

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Brush Generation Facility

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
62
Fiber connectivity12%
65
Energy cost10%
89
Water risk7%
55
Natural hazard6%
75
Buildability7%
65
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
65
Gas pipeline2%
91
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Morgan, ranked by DC Readiness.

Sites near EC Near Brush Generation Facility
SiteTypeVoltageCapacityQueue waitScore
PAWNEESubstation-Adjacent345 kV600 MW6.9 yrs61.4
STORY 345KVSubstation-Adjacent345 kV600 MW6.9 yrs61.4
TAP206216Substation-Adjacent230 kV300 MW6.9 yrs59.5
TAP206215Substation-Adjacent230 kV300 MW6.9 yrs59.3
EC Near Brush Generation FacilityGreenfield1.7 yrs59.2
EC Near Brush Generation FacilityGreenfield1.7 yrs58.9
EC Near Brush Generation FacilityGreenfield1.7 yrs58.5
EC Near Brush Generation FacilityGreenfield1.7 yrs58.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Brush Generation Facility, Morgan. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.